5,667
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CO0303 #06 Y:1994 | 06 | 1994 | Repair and eliminate steam leaks | $2,100 | $1,250 | |
| CO0303 #05 Y:1994 | 05 | 1994 | Use most efficient type of electric motors | $3,130 | $5,790 | |
| CO0303 #04 Y:1994 | 04 | 1994 | Utilize higher efficiency lamps and/or ballasts | $4,780 | $16,000 | |
| CO0303 #03 Y:1994 | 03 | 1994 | Install compressor air intakes in coolest locations | $5,150 | $900 | |
| CO0303 #02 Y:1994 | 02 | 1994 | Recover waste heat from equipment | $10,760 | $55,130 | |
| CO0303 #01 Y:1994 | 01 | 1994 | Recover waste heat from equipment | $15,990 | $55,130 | |
| MA0308 #04 Y:1994 | 04 | 1994 | Eliminate leaks in inert gas and compressed air lines/ valves | $441 | $110 | |
| MA0308 #03 Y:1994 | 03 | 1994 | Replace electrically-operated equipment with fossil fuel equipment | $7,420 | $7,745 | |
| MA0308 #02 Y:1994 | 02 | 1994 | Repair or replace steam traps | $19,471 | $813 | |
| MA0308 #01 Y:1994 | 01 | 1994 | Replace electrically-operated equipment with fossil fuel equipment | $87,650 | $18,145 | |
| MA0305 #08 Y:1994 | 08 | 1994 | Install equipment (eg compactor) to reduce disposal costs | $10,350 | $385 | |
| MA0305 #07 Y:1994 | 07 | 1994 | Recycle waste ink and cleanup solvent | $24,185 | $2,500 | |
| MA0305 #06 Y:1994 | 06 | 1994 | Eliminate leaks in inert gas and compressed air lines/ valves | $764 | $180 | |
| MA0305 #05 Y:1994 | 05 | 1994 | Utilize energy-efficient belts and other improved mechanisms | $698 | - | |
| MA0305 #04 Y:1994 | 04 | 1994 | Use radiant heater for spot heating | $1,508 | $5,569 | |
| MA0305 #03 Y:1994 | 03 | 1994 | Shade windows from summer sun | $15,022 | $41,394 | |
| MA0305 #02 Y:1994 | 02 | 1994 | Use adjustable frequency drive or multiple speed motors on existing system | $4,978 | $14,015 | |
| MA0305 #01 Y:1994 | 01 | 1994 | Recover waste heat from equipment | $18,419 | $10,078 | |
| ME0133 #03 Y:1994 | 03 | 1994 | Use small number of high output units instead of many small inefficient units | $5,276 | $7,200 | |
| ME0133 #02 Y:1994 | 02 | 1994 | Replace electrically-operated equipment with fossil fuel equipment | $18,453 | $6,650 |