Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,368

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0425 #04 Y:1993 Utilize higher efficiency lamps and/or ballasts $467 $1,920
OK0425 #03 Y:1993 Utilize energy-efficient belts and other improved mechanisms $5,605 -
OK0425 #02 Y:1993 Use most efficient type of electric motors $6,846 $11,619
OK0425 #01 Y:1993 Use waste heat to produce steam to drive a steam turbine-generator $1,247,712 $4,815,000
IA0078 #09 Y:1993 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $289 -
IA0078 #08 Y:1993 Reduce the pressure of compressed air to the minimum required $669 $25
IA0078 #07 Y:1993 Replace electrically-operated equipment with fossil fuel equipment $2,352 $2,218
IA0078 #06 Y:1993 Lower temperature during the winter season and vice-versa $3,695 -
IA0078 #05 Y:1993 Reduce space conditioning during non-working hours $7,527 -
IA0078 #04 Y:1993 Install occupancy sensors $1,226 $2,371
IA0078 #03 Y:1993 Disconnect ballasts $1,359 $983
IA0078 #02 Y:1993 Utilize higher efficiency lamps and/or ballasts $7,127 $1,227
IA0078 #01 Y:1993 Add area lighting switches $7,178 $900
OR0199 #06 Y:1993 Size air handling grills/ duct/s coils to minimize air resistance $953 $39,794
OR0199 #05 Y:1993 Analyze flue gas for proper air/fuel ratio $385 $500
OR0199 #04 Y:1993 Utilize higher efficiency lamps and/or ballasts $433 $1,820
OR0199 #03 Y:1993 Make a practice of turning off lights when not needed $2,465 -
OR0199 #02 Y:1993 Use most efficient type of electric motors $256 $1,029
OR0199 #01 Y:1993 Optimize plant power factor $2,311 $3,000
NC0018 #05 Y:1993 Utilize higher efficiency lamps and/or ballasts $2,509 $1,046