4,368
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MO0087 #05 Y:1993 | 05 | 1993 | Use most efficient type of electric motors | $905 | $4,520 | |
| MO0087 #04 Y:1993 | 04 | 1993 | Utilize higher efficiency lamps and/or ballasts | $750 | $385 | |
| MO0087 #03 Y:1993 | 03 | 1993 | Utilize higher efficiency lamps and/or ballasts | $885 | $5,143 | |
| MO0087 #02 Y:1993 | 02 | 1993 | Use synthetic lubricant | $1,117 | $650 | |
| MO0087 #01 Y:1993 | 01 | 1993 | Install compressor air intakes in coolest locations | $1,143 | $1,605 | |
| WV0005 #07 Y:1993 | 07 | 1993 | Close holes and openings in building such as broken windows | $4,213 | $3,542 | |
| WV0005 #06 Y:1993 | 06 | 1993 | Utilize higher efficiency lamps and/or ballasts | $7,008 | $2,485 | |
| WV0005 #05 Y:1993 | 05 | 1993 | Use most efficient type of electric motors | $1,833 | $41,350 | |
| WV0005 #04 Y:1993 | 04 | 1993 | Use waste heat from flue gases to heat space conditioning air | $36,648 | $7,690 | |
| WV0005 #03 Y:1993 | 03 | 1993 | Install vinyl strip / high speed / air curtain doors | $16,651 | $1,600 | |
| WV0005 #02 Y:1993 | 02 | 1993 | Reduce the pressure of compressed air to the minimum required | $1,989 | $20 | |
| WV0005 #01 Y:1993 | 01 | 1993 | Install compressor air intakes in coolest locations | $490 | $160 | |
| MA0272 #08 Y:1993 | 08 | 1993 | Install / repair insulation on condensate lines | $31 | $67 | |
| MA0272 #07 Y:1993 | 07 | 1993 | Insulate bare equipment | $6,765 | $167 | |
| MA0272 #06 Y:1993 | 06 | 1993 | Analyze flue gas for proper air/fuel ratio | $726 | $400 | |
| MA0272 #05 Y:1993 | 05 | 1993 | Use adjustable frequency drive or multiple speed motors on existing system | $4,077 | $5,694 | |
| MA0272 #04 Y:1993 | 04 | 1993 | Utilize energy-efficient belts and other improved mechanisms | $10,797 | - | |
| MA0272 #03 Y:1993 | 03 | 1993 | Utilize higher efficiency lamps and/or ballasts | $13,507 | $12,663 | |
| MA0272 #02 Y:1993 | 02 | 1993 | Eliminate or reduce compressed air usage | $3,741 | $68 | |
| MA0272 #01 Y:1993 | 01 | 1993 | Use adjustable frequency drive or multiple speed motors on existing system | $27,014 | $49 |