Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,368

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0185 #01 Y:1993 Optimize plant power factor $4,350 $10,500
SF0003 #06 Y:1993 Use adjustable frequency drive or multiple speed motors on existing system $6,294 $14,000
SF0003 #05 Y:1993 Use most efficient type of electric motors $2,118 $3,875
SF0003 #04 Y:1993 Insulate bare equipment $453 $557
SF0003 #03 Y:1993 Use optimum thickness insulation $3,546 $4,231
SF0003 #02 Y:1993 Eliminate leaks in inert gas and compressed air lines/ valves $1,485 $900
SF0003 #01 Y:1993 Use computer programs to optimize hvac performance $655 $192
OR0176 #07 Y:1993 Optimize plant power factor $9,930 $21,000
OR0176 #06 Y:1993 Utilize higher efficiency lamps and/or ballasts $1,712 $2,537
OR0176 #05 Y:1993 Utilize energy-efficient belts and other improved mechanisms $5,174 $9,100
OR0176 #04 Y:1993 Use most efficient type of electric motors $1,776 $2,859
OR0176 #03 Y:1993 Utilize energy-efficient belts and other improved mechanisms $270 -
OR0176 #02 Y:1993 Use waste heat from hot flue gases to preheat $11,144 $23,450
OR0176 #01 Y:1993 Insulate bare equipment $576 -
OK0411 #05 Y:1993 Reduce illumination to minimum necessary levels $198 $375
OK0411 #04 Y:1993 Use plant owned transformers or lease transformers $76,619 $177,000
OK0411 #03 Y:1993 Optimize plant power factor $2,790 $3,332
OK0411 #02 Y:1993 Utilize higher efficiency lamps and/or ballasts $211 $174
OK0411 #01 Y:1993 Install compressor air intakes in coolest locations $1,179 $946
OK0408 #04 Y:1993 Use cooling tower or economizer to replace chiller cooling $2,789 $9,000