Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,237

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KU0340 #02 Y:1991 Minimize use of outside make-up air for ventilation except when used for economizer cycle $7,689 $200
KU0340 #01 Y:1991 Install timers and/or thermostats $8,570 -
IA0002 #08 Y:1991 Install compressor air intakes in coolest locations $230 $50
IA0002 #07 Y:1991 Utilize higher efficiency lamps and/or ballasts $141 $261
IA0002 #06 Y:1991 Install timers and/or thermostats $446 $300
IA0002 #05 Y:1991 Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $527 -
IA0002 #04 Y:1991 Eliminate or reduce compressed air usage $1,727 $100
IA0002 #03 Y:1991 Use most efficient type of electric motors $545 $2,336
IA0002 #02 Y:1991 Eliminate leaks in inert gas and compressed air lines/ valves $3,080 $100
IA0001 #09 Y:1991 Reduce the pressure of compressed air to the minimum required $192 $20
IA0001 #08 Y:1991 Install compressor air intakes in coolest locations $112 $20
IA0001 #07 Y:1991 Install compressor air intakes in coolest locations $95 $20
IA0001 #06 Y:1991 Reduce illumination to minimum necessary levels $182 $90
IA0001 #05 Y:1991 Recover waste heat from equipment $382 $686
IA0001 #04 Y:1991 Reduce ventilation air $507 $700
IA0001 #03 Y:1991 Utilize higher efficiency lamps and/or ballasts $248 -
IA0001 #02 Y:1991 Improve air circulation with destratification fans / other methods $464 $448
IA0001 #01 Y:1991 Install timers and/or thermostats $2,263 $900
GT0438 #07 Y:1991 Analyze flue gas for proper air/fuel ratio $1,535 -
GT0438 #06 Y:1991 Use most efficient type of electric motors $2,350 $2,570