2,223
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TN0391 #08 Y:1989 | 08 | 1989 | Insulate bare equipment | $360 | $512 | |
| TN0391 #07 Y:1989 | 07 | 1989 | Utilize higher efficiency lamps and/or ballasts | $577 | $350 | |
| TN0391 #06 Y:1989 | 06 | 1989 | Insulate bare equipment | $1,421 | $263 | |
| TN0391 #05 Y:1989 | 05 | 1989 | Improve air circulation with destratification fans / other methods | $465 | $3,000 | |
| TN0391 #04 Y:1989 | 04 | 1989 | Install compressor air intakes in coolest locations | $5,420 | $2,780 | |
| TN0391 #03 Y:1989 | 03 | 1989 | Install vinyl strip / high speed / air curtain doors | $1,950 | $1,800 | |
| TN0391 #02 Y:1989 | 02 | 1989 | Utilize energy-efficient belts and other improved mechanisms | $13,800 | $5,200 | |
| TN0391 #01 Y:1989 | 01 | 1989 | Eliminate leaks in inert gas and compressed air lines/ valves | $15,900 | $480 | |
| TN0390 #07 Y:1989 | 07 | 1989 | Replace electrically-operated equipment with fossil fuel equipment | $167,999 | $976,000 | |
| TN0390 #06 Y:1989 | 06 | 1989 | Utilize higher efficiency lamps and/or ballasts | $703 | $438 | |
| TN0390 #05 Y:1989 | 05 | 1989 | Keep lamps and reflectors clean | $1,983 | $5,850 | |
| TN0390 #04 Y:1989 | 04 | 1989 | Utilize energy-efficient belts and other improved mechanisms | $28,121 | $12,250 | |
| TN0390 #03 Y:1989 | 03 | 1989 | Install timers and/or thermostats | $11,893 | $1,200 | |
| TN0390 #02 Y:1989 | 02 | 1989 | Install compressor air intakes in coolest locations | $39,625 | $5,440 | |
| TN0390 #01 Y:1989 | 01 | 1989 | Improve lubrication practices | $44,021 | $13,500 | |
| RU0079 #06 Y:1989 | 06 | 1989 | Use optimum temperature | $115,500 | - | |
| RU0079 #05 Y:1989 | 05 | 1989 | Improve air circulation with destratification fans / other methods | $2,725 | $8,460 | |
| RU0079 #04 Y:1989 | 04 | 1989 | Analyze flue gas for proper air/fuel ratio | $8,409 | $500 | |
| RU0079 #03 Y:1989 | 03 | 1989 | Turn off equipment during breaks, reduce operating time | $11,329 | - | |
| RU0079 #02 Y:1989 | 02 | 1989 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,185 | $725 |