Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AT0125 #04 Y:1988 Install compressor air intakes in coolest locations $1,202 $160
AT0125 #03 Y:1988 Recover heat from exhausted steam, hot air or hot water $8,395 $15,000
AT0125 #02 Y:1988 Utilize higher efficiency lamps and/or ballasts $8,988 $1,306
AT0125 #01 Y:1988 Use computer programs to optimize hvac performance $33,982 $5,000
AM0058 #03 Y:1988 Utilize energy-efficient belts and other improved mechanisms $155 -
AM0058 #02 Y:1988 Use separate switches on perimeter lighting which may be turned off when natural light is available $280 $300
AM0058 #01 Y:1988 Adjust / maintain fork lift trucks for most efficient operation $1,450 -
AM0057 #07 Y:1988 Utilize higher efficiency lamps and/or ballasts $68 $62
AM0057 #06 Y:1988 Improve lubrication practices $283 -
AM0057 #05 Y:1988 Reschedule plant operations or reduce load to avoid peaks $478 -
AM0057 #04 Y:1988 Eliminate leaks in inert gas and compressed air lines/ valves $680 $540
AM0057 #03 Y:1988 Utilize higher efficiency lamps and/or ballasts $1,710 $2,406
AM0057 #02 Y:1988 Utilize higher efficiency lamps and/or ballasts $655 $242
AM0057 #01 Y:1988 Burn wood by-products for heat $7,900 $29,000
WI0053 #06 Y:1988 Improve lubrication practices $6,226 -
WI0053 #05 Y:1988 Recharge batteries on during off-peak demand periods $487 $1,000
WI0053 #04 Y:1988 Analyze flue gas for proper air/fuel ratio $577 $500
WI0053 #03 Y:1988 Install storm windows and doors $2,689 $6,820
WI0053 #02 Y:1988 Use in-process recycling whenever possible $12,776 $15,000
WI0053 #01 Y:1988 Replace electrically-operated equipment with fossil fuel equipment $68,209 $80,000