2,629
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| GT0371 #06 Y:1988 | 06 | 1988 | Reduce the pressure of compressed air to the minimum required | $1,466 | - | |
| GT0371 #05 Y:1988 | 05 | 1988 | Use most efficient type of electric motors | $66 | $75 | |
| GT0371 #04 Y:1988 | 04 | 1988 | Utilize energy-efficient belts and other improved mechanisms | $185 | - | |
| GT0371 #03 Y:1988 | 03 | 1988 | Install compressor air intakes in coolest locations | $185 | $75 | |
| GT0371 #02 Y:1988 | 02 | 1988 | Install vinyl strip / high speed / air curtain doors | $2,150 | $3,460 | |
| GT0371 #01 Y:1988 | 01 | 1988 | Utilize higher efficiency lamps and/or ballasts | $4,140 | $10,175 | |
| CO0144 #09 Y:1988 | 09 | 1988 | Utilize higher efficiency lamps and/or ballasts | $214 | $267 | |
| CO0144 #08 Y:1988 | 08 | 1988 | Install timers and/or thermostats | $500 | $450 | |
| CO0144 #07 Y:1988 | 07 | 1988 | Install / repair insulation on condensate lines | $678 | $200 | |
| CO0144 #06 Y:1988 | 06 | 1988 | Eliminate or reduce compressed air usage | $4,942 | $3,500 | |
| CO0144 #05 Y:1988 | 05 | 1988 | Utilize energy-efficient belts and other improved mechanisms | $2,949 | $5,481 | |
| CO0144 #04 Y:1988 | 04 | 1988 | Reschedule plant operations or reduce load to avoid peaks | $963 | - | |
| CO0144 #03 Y:1988 | 03 | 1988 | Replace electrically-operated equipment with fossil fuel equipment | $5,856 | $1,500 | |
| CO0144 #02 Y:1988 | 02 | 1988 | Preheat boiler makeup water with waste process heat | $2,253 | $13,500 | |
| CO0144 #01 Y:1988 | 01 | 1988 | Analyze flue gas for proper air/fuel ratio | $4,650 | $500 | |
| AT0126 #04 Y:1988 | 04 | 1988 | Repair and eliminate steam leaks | $2,533 | $500 | |
| AT0126 #03 Y:1988 | 03 | 1988 | Insulate bare equipment | $5,066 | $10,311 | |
| AT0126 #02 Y:1988 | 02 | 1988 | Analyze flue gas for proper air/fuel ratio | $5,066 | $10,000 | |
| AT0126 #01 Y:1988 | 01 | 1988 | Close off unneeded steam lines | $3,825 | $5,000 | |
| AT0125 #05 Y:1988 | 05 | 1988 | Analyze flue gas for proper air/fuel ratio | $12,671 | $5,500 |