Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,060

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TN0305 #07 Y:1986 Utilize higher efficiency lamps and/or ballasts $526 $120
TN0305 #06 Y:1986 Eliminate or reduce compressed air usage $1,034 $348
TN0305 #05 Y:1986 Reduce illumination to minimum necessary levels $1,297 -
TN0305 #04 Y:1986 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,592 $1,315
TN0305 #03 Y:1986 Eliminate leaks in inert gas and compressed air lines/ valves $2,298 $210
TN0305 #02 Y:1986 Remove or close off unneeded compressed air lines $2,347 $120
TN0305 #01 Y:1986 Shut off pilots in standby equipment $2,479 -
TN0301 #05 Y:1986 Install set-back timers $320 $445
TN0301 #04 Y:1986 Eliminate leaks in inert gas and compressed air lines/ valves $1,618 $75
TN0301 #03 Y:1986 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,200 $400
TN0301 #02 Y:1986 Shut off pilots in standby equipment $1,628 -
TN0301 #01 Y:1986 Improve air circulation with destratification fans / other methods $1,386 $6,000
OK0219 #03 Y:1986 Utilize higher efficiency lamps and/or ballasts $637 $668
OK0219 #02 Y:1986 Install timers and/or thermostats $16,197 $1,400
OK0219 #01 Y:1986 Eliminate leaks in inert gas and compressed air lines/ valves $2,397 -
OK0218 #07 Y:1986 Use waste heat from hot flue gases to preheat $25,085 $52,000
OK0218 #06 Y:1986 Repair faulty insulation in furnaces, boilers, etc $1,136 $503
OK0218 #05 Y:1986 Repair faulty insulation in furnaces, boilers, etc $780 $465
OK0218 #04 Y:1986 Cover open tanks $7,769 $3,608
OK0218 #03 Y:1986 Install / repair insulation on steam lines $1,296 $965