2,381
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| ST0024 #06 Y:1985 | 06 | 1985 | Install automatic stack damper | $200 | $2,550 | |
| ST0024 #05 Y:1985 | 05 | 1985 | Change zone reheat coils to variable air volume boxes | $2,549 | $3,000 | |
| ST0024 #04 Y:1985 | 04 | 1985 | Eliminate leaks in inert gas and compressed air lines/ valves | $893 | $112 | |
| ST0024 #03 Y:1985 | 03 | 1985 | Recover waste heat from equipment | $1,844 | $1,600 | |
| ST0024 #02 Y:1985 | 02 | 1985 | Turn off equipment during breaks, reduce operating time | $65 | $95 | |
| ST0024 #01 Y:1985 | 01 | 1985 | Turn off equipment during breaks, reduce operating time | $196 | - | |
| ST0023 #10 Y:1985 | 10 | 1985 | Use compressor air filters | $479 | $120 | |
| ST0023 #09 Y:1985 | 09 | 1985 | Recover waste heat from equipment | $738 | $2,000 | |
| ST0023 #08 Y:1985 | 08 | 1985 | Lower temperature during the winter season and vice-versa | $2,472 | - | |
| ST0023 #07 Y:1985 | 07 | 1985 | Install solid waste incinerator for heat | $55,176 | $50,000 | |
| ST0023 #06 Y:1985 | 06 | 1985 | Install compressor air intakes in coolest locations | $266 | $182 | |
| ST0023 #05 Y:1985 | 05 | 1985 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,180 | $96 | |
| ST0023 #04 Y:1985 | 04 | 1985 | Utilize higher efficiency lamps and/or ballasts | $21,538 | $6,448 | |
| ST0023 #03 Y:1985 | 03 | 1985 | Reduce hot water temperature to the minimum required | $1,753 | - | |
| ST0023 #02 Y:1985 | 02 | 1985 | Install automatic stack damper | $8,365 | $26,400 | |
| ST0023 #01 Y:1985 | 01 | 1985 | Air condition only space necessary | $1,091 | $125 | |
| ST0022 #11 Y:1985 | 11 | 1985 | Eliminate leaks in water lines and valves | $767 | $5 | |
| ST0022 #10 Y:1985 | 10 | 1985 | Replace hydraulic / pneumatic equipment with electric equipment | $3,680 | $5,600 | |
| ST0022 #09 Y:1985 | 09 | 1985 | Utilize higher efficiency lamps and/or ballasts | $4,480 | $1,246 | |
| ST0022 #08 Y:1985 | 08 | 1985 | Recover waste heat from equipment | $1,502 | $1,000 |