Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0102 #07 Y:2016 Insulate bare equipment $1,239 $863
WM0102 #06 Y:2016 Insulate bare equipment $2,034 $4,700
WM0102 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $4,059 $5,282
WM0102 #04 Y:2016 Install compressor air intakes in coolest locations $4,200 $1,100
WM0102 #03 Y:2016 Repair and eliminate steam leaks $9,764 $1,490
WM0102 #02 Y:2016 Use power during off-peak periods $23,950 $64,500
WM0102 #01 Y:2016 Store heated/ cooled water for use during peak demand periods $149,714 $205,925
WM0099 #12 Y:2016 Insulate bare equipment $274 $315
WM0099 #11 Y:2016 Install compressor air intakes in coolest locations $344 -
WM0099 #10 Y:2016 Utilize energy-efficient belts and other improved mechanisms $358 $120
WM0099 #09 Y:2016 Insulate bare equipment $685 $481
WM0099 #08 Y:2016 Recover waste heat from equipment $733 $2,000
WM0099 #07 Y:2016 Eliminate or reduce compressed air usage $861 $900
WM0099 #06 Y:2016 Utilize controls to operate equipment only when needed $902 $2,200
WM0099 #05 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $1,368 $2,600
WM0099 #04 Y:2016 Use synthetic lubricant $2,414 $4,360
WM0099 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $3,427 $12,056
WM0099 #02 Y:2016 Reschedule plant operations or reduce load to avoid peaks $3,528 -
WM0099 #01 Y:2016 Replace hydraulic / pneumatic equipment with electric equipment $4,017 $11,200
IA0566 #07 Y:2016 Reduce the pressure of compressed air to the minimum required $592 $70