Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0059 #12 Y:2014 Use synthetic lubricant $19,051 $3,070
WM0059 #11 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $4,380 $2,700
WM0059 #10 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $122,690 $136,460
WM0059 #09 Y:2014 Reduce the pressure of compressed air to the minimum required $1,108 -
WM0059 #08 Y:2014 Recover waste heat from equipment $3,568 $900
WM0059 #07 Y:2014 Utilize energy-efficient belts and other improved mechanisms $2,479 $1,560
WM0059 #06 Y:2014 Optimize plant power factor $36,422 $79,091
WM0059 #05 Y:2014 Install equipment to move product $66,000 $172,000
WM0059 #04 Y:2014 Utilize higher efficiency lamps and/or ballasts $42,183 $77,150
WM0059 #03 Y:2014 Utilize higher efficiency lamps and/or ballasts $3,435 $1,410
WM0059 #02 Y:2014 Use waste heat from hot flue gases to preheat $39,318 $17,000
WM0059 #01 Y:2014 Use waste heat from hot flue gases to preheat $39,912 $68,000
IA0528 #08 Y:2014 Reduce the pressure of compressed air to the minimum required $288 $70
IA0528 #07 Y:2014 Install / repair insulation on steam lines $408 $970
IA0528 #06 Y:2014 Install / repair insulation on steam lines $1,974 $1,053
IA0528 #05 Y:2014 Install occupancy sensors $453 $525
IA0528 #04 Y:2014 Use photocell controls $2,865 $630
IA0528 #03 Y:2014 Utilize higher efficiency lamps and/or ballasts $7,031 $10,568
IA0528 #02 Y:2014 Insulate bare equipment $9,196 $7,095
IA0528 #01 Y:2014 Heat water with exhaust heat $14,601 $9,600