14
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WM0035 #07 Y:2013 | 07 | 2013 | Turn off equipment during breaks, reduce operating time | $594 | - | |
| WM0035 #06 Y:2013 | 06 | 2013 | Lower temperature during the winter season and vice-versa | $1,953 | - | |
| WM0035 #05 Y:2013 | 05 | 2013 | Insulate bare equipment | $1,145 | $200 | |
| WM0035 #04 Y:2013 | 04 | 2013 | Analyze flue gas for proper air/fuel ratio | $1,425 | $2,270 | |
| WM0035 #03 Y:2013 | 03 | 2013 | Repair or replace steam traps | $7,478 | $1,500 | |
| WM0035 #02 Y:2013 | 02 | 2013 | Reduce the pressure of compressed air to the minimum required | $771 | - | |
| WM0035 #01 Y:2013 | 01 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $17,932 | $1,000 | |
| WM0032 #07 Y:2013 | 07 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $10,700 | $19,800 | |
| WM0032 #06 Y:2013 | 06 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $9,500 | $20,654 | |
| WM0032 #05 Y:2013 | 05 | 2013 | Conserve energy by efficient use of vending machines | $91 | $137 | |
| WM0032 #04 Y:2013 | 04 | 2013 | Install occupancy sensors | $276 | $270 | |
| WM0032 #03 Y:2013 | 03 | 2013 | Utilize higher efficiency lamps and/or ballasts | $2,268 | $11,516 | |
| WM0032 #02 Y:2013 | 02 | 2013 | Reduce the pressure of compressed air to the minimum required | $1,355 | - | |
| WM0032 #01 Y:2013 | 01 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,693 | $1,260 |