17
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WI0506 #07 Y:2005 | 07 | 2005 | Reduce hot water temperature to the minimum required | $990 | $1,500 | |
| WI0506 #06 Y:2005 | 06 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,430 | - | |
| WI0506 #05 Y:2005 | 05 | 2005 | Recharge batteries on during off-peak demand periods | $1,795 | $800 | |
| WI0506 #04 Y:2005 | 04 | 2005 | Recover waste heat from equipment | $2,464 | $1,000 | |
| WI0506 #03 Y:2005 | 03 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $3,464 | - | |
| WI0506 #02 Y:2005 | 02 | 2005 | Install timers and/or thermostats | $1,049 | - | |
| WI0506 #01 Y:2005 | 01 | 2005 | Utilize higher efficiency lamps and/or ballasts | $7,973 | $16,740 | |
| IC0110 #10 Y:2005 | 10 | 2005 | Utilize higher efficiency lamps and/or ballasts | $473 | $3,388 | |
| IC0110 #09 Y:2005 | 09 | 2005 | Use most efficient type of electric motors | $17,156 | $81,881 | |
| IC0110 #08 Y:2005 | 08 | 2005 | Optimize plant power factor | $13,904 | $70,000 | |
| IC0110 #07 Y:2005 | 07 | 2005 | Modify refrigeration system to operate at a lower pressure | $7,443 | $15,000 | |
| IC0110 #06 Y:2005 | 06 | 2005 | Analyze flue gas for proper air/fuel ratio | $4,956 | - | |
| IC0110 #05 Y:2005 | 05 | 2005 | Improve combustion control capability | $13,789 | $3,500 | |
| IC0110 #04 Y:2005 | 04 | 2005 | Repair and eliminate steam leaks | $6,051 | $400 | |
| IC0110 #03 Y:2005 | 03 | 2005 | Repair or replace steam traps | $29,831 | $1,638 | |
| IC0110 #02 Y:2005 | 02 | 2005 | Substitute hot process fluids for steam | $79,621 | $634,572 | |
| IC0110 #01 Y:2005 | 01 | 2005 | Replace purchased steam with other energy source | $106,617 | $213,420 |