Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,102

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1120 #07 Y:2025 Use solar heat to make electricty $13,285 $224,000
UD1120 #06 Y:2025 Use solar heat to make electricty $969 $500
UD1120 #05 Y:2025 Use or replace with energy efficient substitutes $630 $30,000
UD1120 #04 Y:2025 Utilize a less expensive cooling method $120 $300
UD1120 #03 Y:2025 Use hot process fluids to preheat incoming process fluids $767 $10,000
UD1120 #02 Y:2025 Utilize a less expensive cooling method $861 $2,000
UD1120 #01 Y:2025 Utilize a less expensive cooling method $1,599 $2,000
UD1119 #06 Y:2025 Use heat pump for space conditioning $24,495 $100,000
UD1119 #05 Y:2025 Use or replace with energy efficient substitutes $649 $6,400
UD1119 #04 Y:2025 Utilize a less expensive cooling method $855 $550
UD1119 #03 Y:2025 Use solar heat to make electricty $7,022 $100,000
UD1119 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,147 $16,000
UD1119 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $8,511 $40,000
UD1115 #06 Y:2025 Install compressor air intakes in coolest locations $1,479 $1,015
UD1115 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $2,587 $5,423
UD1115 #04 Y:2025 Insulate bare equipment $892 $1,267
UD1115 #03 Y:2025 Meter recycled water (to reduce sewer charges) $1,016 $760
UD1115 #02 Y:2025 Optimize plant power factor $2,927 $3,700
UD1115 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $25,515 $7,035
UD1114 #07 Y:2025 Optimize plant power factor $7,290 $15,550