Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,198

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1126 #03 Y:2025 Pay utility bills on time $2,991 -
UD1126 #02 Y:2025 Meter recycled water (to reduce sewer charges) $9,848 $2,500
UD1126 #01 Y:2025 Change rate schedules or other changes in utility service $32,372 -
UD1125 #05 Y:2025 Install occupancy sensors $1,480 $1,208
UD1125 #04 Y:2025 Reduce space conditioning during non-working hours $57,613 $3,735
UD1125 #03 Y:2025 Eliminate or reduce compressed air usage $4,431 -
UD1125 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $20,992 $953
UD1125 #01 Y:2025 Pay utility bills on time $11,153 -
MU0081 #14 Y:2025 Pay bills on time to avoid late fees $2,909 -
MU0081 #13 Y:2025 Close holes and openings in building such as broken windows $2,387 $3,780
MU0081 #12 Y:2025 Install timers and/or thermostats $2,384 $2,640
MU0081 #11 Y:2025 Replace existing hvac unit with high efficiency model $6,174 $30,357
MU0081 #10 Y:2025 Use radiant heater for spot heating $1,230 $1,870
MU0081 #09 Y:2025 Utilize higher efficiency lamps and/or ballasts $79 $416
MU0081 #08 Y:2025 Utilize higher efficiency lamps and/or ballasts $632 $2,511
MU0081 #07 Y:2025 Install occupancy sensors $148 $797
MU0081 #06 Y:2025 Use or replace with energy efficient substitutes $211 $1,574
MU0081 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,045 $300
MU0081 #04 Y:2025 Install compressor air intakes in coolest locations $1,401 $2,529
MU0081 #03 Y:2025 Insulate bare equipment $60 $295