1,556
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NL0129 #05 Y:2026 | 05 | 2026 | Install occupancy sensors | $778 | $1,744 |
n/a
|
| NL0129 #04 Y:2026 | 04 | 2026 | Apply for tax-free status for energy purchases | $8,173 | $264 |
n/a
|
| NL0129 #03 Y:2026 | 03 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $13,072 | $41,500 |
n/a
|
| NL0129 #02 Y:2026 | 02 | 2026 | Upgrade obsolete equipment | $226,046 | $346,302 |
n/a
|
| NL0129 #01 Y:2026 | 01 | 2026 | Add equipment/ operators to reduce production bottleneck | $15,722,064 | $5,073,962 |
n/a
|
| NL0128 #06 Y:2026 | 06 | 2026 | Utilize higher efficiency lamps and/or ballasts | $3,832 | $3,600 |
n/a
|
| NL0128 #05 Y:2026 | 05 | 2026 | Use optimum temperature | $12,756 | $40,000 |
n/a
|
| NL0128 #04 Y:2026 | 04 | 2026 | Air condition only space necessary | $13,467 | $7,019 |
n/a
|
| NL0128 #03 Y:2026 | 03 | 2026 | Meter waste water | $18,726 | $15,000 |
n/a
|
| NL0128 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $41,428 | $20,000 |
n/a
|
| NL0128 #01 Y:2026 | 01 | 2026 | Apply a protective coating to racks and tanks | $103,072 | $2,040 |
n/a
|
| NL0124 #05 Y:2025 | 05 | 2025 | Install compressor air intakes in coolest locations | $1,720 | $4,170 |
n/a
|
| NL0124 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,696 | $1,000 |
n/a
|
| NL0124 #03 Y:2025 | 03 | 2025 | Install occupancy sensors | $5,075 | $11,340 |
n/a
|
| NL0124 #02 Y:2025 | 02 | 2025 | Utilize higher efficiency lamps and/or ballasts | $10,061 | $11,590 |
n/a
|
| NL0124 #01 Y:2025 | 01 | 2025 | Upgrade obsolete equipment | $150,000 | $875,540 |
n/a
|
| NL0123 #06 Y:2025 | 06 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $697 | $443 |
n/a
|
| NL0123 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,523 | $9,000 |
n/a
|
| NL0123 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $23,122 | $24,804 |
n/a
|
| NL0123 #03 Y:2025 | 03 | 2025 | Optimize plant power factor | $206,052 | $550,650 |
n/a
|