Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,239

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MUCM23 #10 Y:2024 Pay bills on time to avoid late fees $1,017 -
MUCM23 #09 Y:2024 Combine utility meters $119 -
MUCM23 #08 Y:2024 Reschedule and rearrange multiple-source heating systems $5,208 -
MUCM23 #07 Y:2024 Install timers and/or thermostats $23,125 $1,830
MU0055 #08 Y:2024 Use solar heat to make electricty $15,989 $163,856
MU0055 #07 Y:2024 Install vinyl strip / high speed / air curtain doors $113 $641
MU0055 #06 Y:2024 Install vinyl strip / high speed / air curtain doors $31,868 $12,988
MU0055 #05 Y:2024 Lower temperature during the winter season and vice-versa $1,775 -
MU0055 #04 Y:2024 Install occupancy sensors $7,346 $2,376
MU0055 #03 Y:2024 Reduce illumination to minimum necessary levels $2,601 -
MU0055 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,002 -
MU0055 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,978 $12,953
MU0058 #09 Y:2024 Pay bills on time to avoid late fees $613 -
MU0058 #08 Y:2024 Close holes and openings in building such as broken windows $4,637 $623
MU0058 #07 Y:2024 Install timers and/or thermostats $2,805 $870
MU0058 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,944 $1,620
MU0058 #05 Y:2024 Install occupancy sensors $99 $118
MU0058 #04 Y:2024 Reduce illumination to minimum necessary levels $253 -
MU0058 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $239 $34
MU0058 #02 Y:2024 Install compressor air intakes in coolest locations $40,066 $1