Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MAS031 #05 Y:2012 Insulate bare equipment $593 $425
MAS031 #04 Y:2012 Turn off equipment when not in use $2,556 $900
MAS031 #03 Y:2012 Reduce the pressure of compressed air to the minimum required $4,640 $200
MAS031 #02 Y:2012 Apply for tax-free status for energy purchases $13,552 $150
MAS031 #01 Y:2012 Use waste heat from hot flue gases to preheat incoming fluids $42,399 $35,000
MA0700 #07 Y:2012 Make a practice of turning off lights when not needed $913 $500
MA0700 #06 Y:2012 Turn off equipment when not in use $1,148 $500
MA0700 #05 Y:2012 Apply for tax-free status for energy purchases $1,934 $500
MA0700 #04 Y:2012 Reschedule plant operations or reduce load to avoid peaks $2,265 $500
MA0700 #03 Y:2012 Turn off equipment when not in use $3,503 $500
MA0700 #02 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $14,586 $24,280
MA0700 #01 Y:2012 Recycle air for heating, ventilation and air conditioning $16,572 $12,830
MA0690 #04 Y:2012 Moderate cooling tower outlet temperature $1,582 $4,075
MA0690 #03 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $1,892 $4,075
MA0690 #02 Y:2012 Use cooling tower or economizer to replace chiller cooling $1,986 $7,500
MA0690 #01 Y:2012 Insulate bare equipment $3,246 $1,750