1,576
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
LS2419 #04 Y:2024 | 04 | 2024 | Upgrade obsolete equipment | $56,850 | $580,000 | |
LS2419 #02 Y:2024 | 02 | 2024 | Use other waste concentration methods | $50,241 | $154,466 | |
LS2419 #01 Y:2024 | 01 | 2024 | Improve space comfort conditioning | $6,299 | $17,640 | |
LS2418 #06 Y:2024 | 06 | 2024 | Use solar heat to make electricty | $38,367 | $514,800 | |
LS2418 #05 Y:2024 | 05 | 2024 | Replace fossil fuel equipment with electrical equipment | $182,554 | $481,830 | |
LS2418 #04 Y:2024 | 04 | 2024 | Install timers and/or thermostats | $627 | $165 | |
LS2418 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,563 | $135 | |
LS2418 #02 Y:2024 | 02 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $2,302 | $200 | |
LS2418 #01 Y:2024 | 01 | 2024 | Reduce the pressure of compressed air to the minimum required | $2,114 | $50 | |
LS2417 #07 Y:2024 | 07 | 2024 | Use solar heat to make electricty | $63,875 | $514,800 | |
LS2417 #06 Y:2024 | 06 | 2024 | Use most efficient type of electric motors | $33,694 | $120,300 | |
LS2417 #05 Y:2024 | 05 | 2024 | Upgrade controls on compressors | $9,379 | $28,000 | |
LS2417 #04 Y:2024 | 04 | 2024 | Replace fossil fuel equipment with electrical equipment | $182,554 | $481,830 | |
LS2417 #03 Y:2024 | 03 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $82,069 | $99,800 | |
LS2417 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,173 | $90 | |
LS0724 #05 Y:2024 | 05 | 2024 | Use most efficient type of electric motors | $1,082 | $3,400 | |
LS0724 #03 Y:2024 | 03 | 2024 | Clean or color roof to reduce solar load | $1,836 | $4,158 | |
LT8408 #01 Y:2024 | 01 | 2024 | Use photocell controls | $627 | $283 | |
LS2414 #05 Y:2024 | 05 | 2024 | Replace boiler | $58,575 | $420,000 | |
LS2414 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,889 | $1,050 |