3,009
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UL2511 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $4,525 | - |
n/a
|
| UL2509 #06 Y:2025 | 06 | 2025 | Lower ceiling to reduce conditioned space | $25,358 | $30,000 |
n/a
|
| UL2509 #05 Y:2025 | 05 | 2025 | Use outside cold water source as a supply of cooling water | $35,838 | $43,234 |
n/a
|
| UL2509 #04 Y:2025 | 04 | 2025 | Use solar heat to make electricty | $169,510 | $2,499,627 |
n/a
|
| UL2509 #03 Y:2025 | 03 | 2025 | Install occupancy sensors | $1,146 | $4,527 |
n/a
|
| UL2509 #02 Y:2025 | 02 | 2025 | Reduce illumination to minimum necessary levels | $391 | - |
n/a
|
| UL2509 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,434 | $735 |
n/a
|
| UL2508 #09 Y:2025 | 09 | 2025 | Use solar heat to make electricty | $36,405 | $305,296 |
n/a
|
| UL2508 #08 Y:2025 | 08 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $3,751 | $375 |
n/a
|
| UL2508 #07 Y:2025 | 07 | 2025 | Use waste heat from hot flue gases to preheat | $43,597 | $30,000 |
n/a
|
| UL2508 #06 Y:2025 | 06 | 2025 | Install occupancy sensors | $55 | $237 |
n/a
|
| UL2508 #05 Y:2025 | 05 | 2025 | Install spectral reflectors / delamp | $141 | - |
n/a
|
| UL2508 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $3,012 | $3,773 |
n/a
|
| UL2508 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,829 | $840 |
n/a
|
| UL2508 #02 Y:2025 | 02 | 2025 | Replace existing equipment with more suitable substitutes | $53,908 | $84,265 |
n/a
|
| UL2508 #01 Y:2025 | 01 | 2025 | Optimize plant power factor | $25,350 | $14,859 |
n/a
|
| UL2507 #03 Y:2025 | 03 | 2025 | Use outside cold water source as a supply of cooling water | $16,032 | $37,000 |
n/a
|
| UL2507 #02 Y:2025 | 02 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $11,632 | $24,675 |
n/a
|
| UL2507 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $56,773 | $527,158 |
n/a
|
| UL2506 #06 Y:2025 | 06 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $3,323 | $17,116 |
n/a
|