Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0133 #05 Y:2019 Re-size charging openings or add movable cover or door $2,196 $4,991
IP0133 #04 Y:2019 Turn off equipment during breaks, reduce operating time $618 $553
IP0133 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $16,033 $14,189
IP0133 #02 Y:2019 Utilize outside air instead of conditioned air for drying $2,073 $1,218
IP0133 #01 Y:2019 Install occupancy sensors $1,574 $343
UD1012 #18 Y:2019 Install equipment (eg compactor) to reduce disposal costs $1,565 $2,500
UD1012 #17 Y:2019 Use direct air supply to exhaust hoods $24,810 $35,000
UD1012 #16 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $1,160 -
UD1012 #15 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $1,548 -
UD1012 #14 Y:2019 Use optimum size and capacity equipment $3,073 -
UD1012 #13 Y:2019 Install motor voltage controller on lightly loaded motors $17,175 $14,500
UD1012 #12 Y:2019 Install motor voltage controller on lightly loaded motors $34,941 $20,000
UD1012 #11 Y:2019 Meter recycled water (to reduce sewer charges) $86,219 $9,464
UD1012 #10 Y:2019 Optimize plant power factor $145,150 $100,000
UD1012 #09 Y:2019 Utilize a less expensive cooling method $27,338 -
UD1012 #08 Y:2019 Modify refrigeration system to operate at a lower pressure $46,434 -
UD1012 #07 Y:2019 Utilize an evaporative air pre-cooler or other heat exchanger in ac system $49,540 $21,295
UD1012 #06 Y:2019 Use excess cold process fluid for industrial cooling needs $67,773 -
UD1012 #05 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $14,521 $1,000
UD1012 #04 Y:2019 Turn off equipment when not in use $4,440 -