Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0108 #12 Y:2018 Optimize plant power factor $864 $4,146
IP0108 #11 Y:2018 Use most efficient type of electric motors $352 $1,323
IP0108 #10 Y:2018 Utilize higher efficiency lamps and/or ballasts $7,909 $19,975
IP0108 #09 Y:2018 Recover waste heat from equipment $1,070 $2,129
IP0108 #08 Y:2018 Install compressor air intakes in coolest locations $685 $1,022
IP0108 #07 Y:2018 Eliminate or reduce compressed air usage $115 $53
IP0108 #06 Y:2018 Use solar heat to make electricty $6,000 $3,479
IP0108 #05 Y:2018 Turn off equipment during breaks, reduce operating time $1,465 $322
IP0108 #04 Y:2018 Install occupancy sensors $2,230 $339
IP0108 #03 Y:2018 Meter recycled water (to reduce sewer charges) $12,119 $600
IP0108 #02 Y:2018 Reduce the pressure of compressed air to the minimum required $880 $4
IP0108 #01 Y:2018 Lower temperature during the winter season and vice-versa $1,011 -
IP0107 #09 Y:2018 Recover waste heat from equipment $18,691 $85,000
IP0107 #08 Y:2018 Install compressor air intakes in coolest locations $582 $2,219
IP0107 #07 Y:2018 Utilize higher efficiency lamps and/or ballasts $10,878 $39,406
IP0107 #06 Y:2018 Reduce the pressure of compressed air to the minimum required $2,610 $7,858
IP0107 #05 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $3,646 $9,560
IP0107 #04 Y:2018 Re-use or recycle hot or cold process exhaust air $957 $2,201
IP0107 #03 Y:2018 Insulate bare equipment $629 $1,485
IP0107 #02 Y:2018 Utilize energy-efficient belts and other improved mechanisms $1,840 $3,587