Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,890

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0312 #07 Y:2024 Turn off steam / hot water lines leading to space heating units $2,161 -
IC0312 #06 Y:2024 Eliminate/reduce an operation $70,893 -
IC0312 #04 Y:2024 Use solar heat to make electricty $196,644 $810,434
IC0312 #03 Y:2024 Utilize energy-efficient belts and other improved mechanisms $1,867 $1,676
IC0311 #06 Y:2024 Eliminate or reduce compressed air usage $844 $140
IC0311 #04 Y:2024 Reduce illumination to minimum necessary levels $112 $774
IC0310 #11 Y:2024 Close holes and openings in building such as broken windows $304 $256
IC0310 #10 Y:2024 Clean or color roof to reduce solar load $23,488 $41,533
IC0310 #08 Y:2024 Install timers and/or thermostats $3,945 $1,100
IC0310 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,515 $419
IC0310 #03 Y:2024 Turn off steam / hot water lines leading to space heating units $6,404 -
IC0310 #02 Y:2024 Replace existing hvac unit with high efficiency model $3,362 $3,159
IC0310 #01 Y:2024 Use solar heat to make electricty $116,487 $542,440
IC0309 #07 Y:2024 Use demand controller or load shedder $266 $1,358
IC0309 #06 Y:2024 Close holes and openings in building such as broken windows $121 $73
IC0308 #09 Y:2024 Clean or color roof to reduce solar load $5,885 $12,020
IC0308 #08 Y:2024 Use solar heat to make electricty $30,752 $190,030
IC0308 #04 Y:2024 Replace hydraulic / pneumatic equipment with electric equipment $146 $490
IC0308 #03 Y:2024 Install spectral reflectors / delamp $369 $422
IC0307 #11 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $7,967 $2,321