Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,765

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT1012 #10 Y:2026 Use solar heat to make electricty $349,269 $2,074,730
GT1012 #09 Y:2026 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $282,619 $966,000
GT1012 #08 Y:2026 Install occupancy sensors $4,069 $9,210
GT1012 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $8,900 $14,637
GT1012 #06 Y:2026 Turn off equipment during breaks, reduce operating time $1,511 $2,210
GT1012 #05 Y:2026 Eliminate or reduce compressed air usage $10,234 $14,450
GT1012 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $7,194 $9,500
GT1012 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $19,620 $20,000
GT1012 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $86,480 $1,850
GT1012 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $9,373 $100
KS2648 #05 Y:2026 Use solar heat to make electricty $71,623 $722,120
KS2648 #04 Y:2026 Apply for tax-free status for energy purchases $2,220 $800
KS2648 #03 Y:2026 Isolate hot or cold equipment $4,312 $3,012
KS2648 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $1,308 $90
KS2648 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $7,578 $6,440
GT1009 #07 Y:2026 Use solar heat to make electricty $46,591 $848,967
GT1009 #06 Y:2026 Use / purchase optimum sized compressor $10,512 $45,000
GT1009 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $421 $1,050
GT1009 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $2,314 $5,500
GT1009 #03 Y:2026 Reduce space conditioning during non-working hours $2,143 $1,350