3,760
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UF0632 #14 Y:2025 | 14 | 2025 | Improve space comfort conditioning | $1,115 | $3,888 | |
| UF0632 #12 Y:2025 | 12 | 2025 | Level zero – install control systems for existing equipment | $7,429 | $20,000 | |
| UF0632 #09 Y:2025 | 09 | 2025 | Install turbulators | $2,277 | $3,750 | |
| UF0632 #05 Y:2025 | 05 | 2025 | Utilize controls to operate equipment only when needed | $5,526 | $20,560 | |
| UF0632 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $43,631 | $322,608 | |
| UF0631 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $45,516 | $322,608 | |
| UF0630 #11 Y:2025 | 11 | 2025 | Level zero – install control systems for existing equipment | $11,572 | $20,000 | |
| UF0630 #07 Y:2025 | 07 | 2025 | Utilize controls to operate equipment only when needed | $6,407 | $25,400 | |
| UF0630 #05 Y:2025 | 05 | 2025 | Improve combustion control capability | $10,115 | $40,000 | |
| UF0630 #02 Y:2025 | 02 | 2025 | Keep solid fuels / raw materials dry | $25,034 | $48,000 | |
| UF0629 #04 Y:2025 | 04 | 2025 | Utilize controls to operate equipment only when needed | $8,306 | $25,400 | |
| UF0629 #03 Y:2025 | 03 | 2025 | Replace existing chiller with high efficiency model | $14,977 | $47,000 | |
| UF0629 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $42,690 | $322,608 | |
| UF0628 #10 Y:2025 | 10 | 2025 | Install compressor air intakes in coolest locations | $514 | $1,235 | |
| UF0628 #05 Y:2025 | 05 | 2025 | Upgrade obsolete equipment | $4,580 | $16,608 | |
| UF0628 #04 Y:2025 | 04 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $10,671 | $41,856 | |
| UF0628 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $45,801 | $322,608 | |
| UF0627 #08 Y:2025 | 08 | 2025 | Replace old machine with new automatic multi-station tool | $41,600 | $98,000 | |
| UF0627 #04 Y:2025 | 04 | 2025 | Clean or color roof to reduce solar load | $5,567 | $9,248 | |
| UF0626 #07 Y:2024 | 07 | 2024 | Redesign process | $1,168 | $4,600 |