Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,760

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0632 #14 Y:2025 Improve space comfort conditioning $1,115 $3,888
UF0632 #12 Y:2025 Level zero – install control systems for existing equipment $7,429 $20,000
UF0632 #09 Y:2025 Install turbulators $2,277 $3,750
UF0632 #05 Y:2025 Utilize controls to operate equipment only when needed $5,526 $20,560
UF0632 #01 Y:2025 Use solar heat to make electricty $43,631 $322,608
UF0631 #01 Y:2025 Use solar heat to make electricty $45,516 $322,608
UF0630 #11 Y:2025 Level zero – install control systems for existing equipment $11,572 $20,000
UF0630 #07 Y:2025 Utilize controls to operate equipment only when needed $6,407 $25,400
UF0630 #05 Y:2025 Improve combustion control capability $10,115 $40,000
UF0630 #02 Y:2025 Keep solid fuels / raw materials dry $25,034 $48,000
UF0629 #04 Y:2025 Utilize controls to operate equipment only when needed $8,306 $25,400
UF0629 #03 Y:2025 Replace existing chiller with high efficiency model $14,977 $47,000
UF0629 #01 Y:2025 Use solar heat to make electricty $42,690 $322,608
UF0628 #10 Y:2025 Install compressor air intakes in coolest locations $514 $1,235
UF0628 #05 Y:2025 Upgrade obsolete equipment $4,580 $16,608
UF0628 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $10,671 $41,856
UF0628 #01 Y:2025 Use solar heat to make electricty $45,801 $322,608
UF0627 #08 Y:2025 Replace old machine with new automatic multi-station tool $41,600 $98,000
UF0627 #04 Y:2025 Clean or color roof to reduce solar load $5,567 $9,248
UF0626 #07 Y:2024 Redesign process $1,168 $4,600