Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,859

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0631 #09 Y:2025 Replace existing equipment with more suitable substitutes $45,000 $1,900
UF0631 #08 Y:2025 Replace old machine with new automatic multi-station tool $52,000 $98,000
UF0631 #07 Y:2025 Improve space comfort conditioning $65,876 $2,873
UF0631 #06 Y:2025 Upgrade controls on compressors $1,095 $4,000
UF0631 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $1,201 -
UF0631 #04 Y:2025 Minimize condenser cooling water temperature $1,216 $4,665
UF0631 #03 Y:2025 Utilize controls to operate equipment only when needed $2,030 $500
UF0631 #02 Y:2025 Use demand controller or load shedder $30,505 $15,454
UF0631 #01 Y:2025 Use solar heat to make electricty $45,516 $322,608
UF0630 #12 Y:2025 Level one – add communication using iiot devices to existing control system to modify operations $1,323 -
UF0630 #11 Y:2025 Level zero – install control systems for existing equipment $11,572 $20,000
UF0630 #10 Y:2025 Turn off equipment when not in use $625 $1,750
UF0630 #09 Y:2025 Utilize energy-efficient belts and other improved mechanisms $958 -
UF0630 #08 Y:2025 Install soft-start to eliminate nuisance trips $1,256 $2,120
UF0630 #07 Y:2025 Utilize controls to operate equipment only when needed $6,407 $25,400
UF0630 #06 Y:2025 Use most efficient type of electric motors $9,264 $14,760
UF0630 #05 Y:2025 Improve combustion control capability $10,115 $40,000
UF0630 #04 Y:2025 Improve combustion control capability $10,115 $2,000
UF0630 #03 Y:2025 Use demand controller or load shedder $12,224 $8,907
UF0630 #02 Y:2025 Keep solid fuels / raw materials dry $25,034 $48,000