ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UF0631 #09 Y:2025 | 09 | 2025 | Replace existing equipment with more suitable substitutes | $45,000 | $1,900 |
n/a
|
UF0631 #08 Y:2025 | 08 | 2025 | Replace old machine with new automatic multi-station tool | $52,000 | $98,000 |
n/a
|
UF0631 #07 Y:2025 | 07 | 2025 | Improve space comfort conditioning | $65,876 | $2,873 |
n/a
|
UF0631 #06 Y:2025 | 06 | 2025 | Upgrade controls on compressors | $1,095 | $4,000 |
n/a
|
UF0631 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,201 | - |
n/a
|
UF0631 #04 Y:2025 | 04 | 2025 | Minimize condenser cooling water temperature | $1,216 | $4,665 |
n/a
|
UF0631 #03 Y:2025 | 03 | 2025 | Utilize controls to operate equipment only when needed | $2,030 | $500 |
n/a
|
UF0631 #02 Y:2025 | 02 | 2025 | Use demand controller or load shedder | $30,505 | $15,454 |
n/a
|
UF0631 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $45,516 | $322,608 |
n/a
|
UF0630 #12 Y:2025 | 12 | 2025 | Level one – add communication using iiot devices to existing control system to modify operations | $1,323 | - |
n/a
|
UF0630 #11 Y:2025 | 11 | 2025 | Level zero – install control systems for existing equipment | $11,572 | $20,000 |
n/a
|
UF0630 #10 Y:2025 | 10 | 2025 | Turn off equipment when not in use | $625 | $1,750 |
n/a
|
UF0630 #09 Y:2025 | 09 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $958 | - |
n/a
|
UF0630 #08 Y:2025 | 08 | 2025 | Install soft-start to eliminate nuisance trips | $1,256 | $2,120 |
n/a
|
UF0630 #07 Y:2025 | 07 | 2025 | Utilize controls to operate equipment only when needed | $6,407 | $25,400 |
n/a
|
UF0630 #06 Y:2025 | 06 | 2025 | Use most efficient type of electric motors | $9,264 | $14,760 |
n/a
|
UF0630 #05 Y:2025 | 05 | 2025 | Improve combustion control capability | $10,115 | $40,000 |
n/a
|
UF0630 #04 Y:2025 | 04 | 2025 | Improve combustion control capability | $10,115 | $2,000 |
n/a
|
UF0630 #03 Y:2025 | 03 | 2025 | Use demand controller or load shedder | $12,224 | $8,907 |
n/a
|
UF0630 #02 Y:2025 | 02 | 2025 | Keep solid fuels / raw materials dry | $25,034 | $48,000 |
n/a
|