Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,908

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CO0388 #09 Y:1997 Eliminate/reduce redundant inspections $5,910 $14,000
CO0388 #08 Y:1997 Use less toxic and volatile solvent substitutes $1,180 $1,500
CO0388 #07 Y:1997 Burn waste oil for heat $830 $3,320
CO0388 #06 Y:1997 Utilize a central coolant system for cleaning and reuse of metal working fluid $3,300 $11,100
CO0388 #05 Y:1997 Use most efficient type of electric motors $260 $500
CO0388 #04 Y:1997 Install compressor air intakes in coolest locations $390 $330
CO0388 #03 Y:1997 Recover waste heat from equipment $390 $930
CO0388 #02 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $970 $400
CO0388 #01 Y:1997 Utilize higher efficiency lamps and/or ballasts $1,648 $3,958
CO0387 #09 Y:1997 Reduce defects by reducing product tipping $15,600 $21,000
CO0387 #08 Y:1997 Install back-up equipment $33,500 $90,000
CO0387 #07 Y:1997 Use filtration, centrifuging to remove contaminants $18,030 $4,000
CO0387 #06 Y:1997 Install compressor air intakes in coolest locations $220 $290
CO0387 #05 Y:1997 Eliminate or reduce compressed air usage $380 $430
CO0387 #04 Y:1997 Repair and eliminate steam leaks $670 $140
CO0387 #03 Y:1997 Use most efficient type of electric motors $289 $288
CO0387 #02 Y:1997 Analyze flue gas for proper air/fuel ratio $2,130 $1,500
CO0387 #01 Y:1997 Recover waste heat from equipment $6,360 $8,400
CO0386 #08 Y:1997 Reduce defects by reducing product tipping $9,540 $1,350
CO0386 #07 Y:1997 Re-arrange equipment layout to reduce handling costs $156,000 $7,470