Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,015

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CO0405 #04 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $800 $330
CO0405 #03 Y:1997 Make a practice of turning off lights when not needed $840 -
CO0405 #02 Y:1997 Utilize higher efficiency lamps and/or ballasts $835 $90
CO0405 #01 Y:1997 Insulate glazing, walls, ceilings, and roofs $5,110 $5,390
CO0404 #05 Y:1997 Use a less expensive method of waste removal $200 -
CO0404 #04 Y:1997 Install compressor air intakes in coolest locations $210 $440
CO0404 #03 Y:1997 Utilize higher efficiency lamps and/or ballasts $365 $498
CO0404 #02 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $1,420 $280
CO0404 #01 Y:1997 Reschedule plant operations or reduce load to avoid peaks $7,800 $5,000
CO0403 #06 Y:1997 Eliminate shift $3,120 -
CO0403 #05 Y:1997 Install / repair insulation on steam lines $280 $810
CO0403 #04 Y:1997 Repair and eliminate steam leaks $380 $300
CO0403 #03 Y:1997 Use separate switches on perimeter lighting which may be turned off when natural light is available $1,180 -
CO0403 #02 Y:1997 Minimize condenser cooling water temperature $1,790 $2,000
CO0403 #01 Y:1997 Utilize higher efficiency lamps and/or ballasts $6,072 $6,685
CO0402 #08 Y:1997 Re-arrange equipment layout to reduce handling costs $8,970 $20,000
CO0402 #07 Y:1997 Add additional production shift $35,580 $730
CO0402 #06 Y:1997 Use a less expensive method of waste removal $360 -
CO0402 #05 Y:1997 Use less toxic and volatile solvent substitutes $970 -
CO0402 #04 Y:1997 Use less toxic and volatile solvent substitutes $930 -