Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,172

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0676 #10 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,179 $8,868
SD0676 #09 Y:2025 Utilize a less expensive cooling method $153,587 $200,000
SD0676 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,684 $2,699
SD0676 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $13,821 $7,047
SD0676 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $39,510 $44,993
SD0676 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,618 $1,911
SD0676 #02 Y:2025 Use battery storage for demand control $109,396 $5,254
SD0676 #01 Y:2025 Use solar heat to make electricty $35,908 $47,771
SJ0034 #04 Y:2025 Use power during off-peak periods $1,270 -
SD0670 #09 Y:2025 Utilize higher efficiency lamps and/or ballasts $459 $1,842
SD0670 #08 Y:2025 Use insulation in furnaces to facilitate heating / cooling $669 $511
SD0670 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,896 $9,455
SD0670 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,220 $3,314
SD0670 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $60 -
SD0670 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $161 $932
SD0670 #03 Y:2025 Install direct acting units in place of compressed air pressure system in safety system $1,711 $6,733
SD0670 #02 Y:2025 Use battery storage for demand control $5,044 $470
SD0670 #01 Y:2025 Use solar heat to make electricty $30,558 $134,423
SD0669 #08 Y:2025 Use properly designed and sized hvac equipment $21,106 $91,450