Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,652

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0334 #07 Y:2005 Turn off equipment when not in use $6,065 -
NC0334 #06 Y:2005 Clean and maintain refrigerant condensers and towers $3,773 $1,300
NC0334 #05 Y:2005 Reduce ventilation air $10,892 $4,000
NC0334 #04 Y:2005 Recover and reuse cooling water $1,680 $620
NC0334 #03 Y:2005 Turn off equipment when not in use $8,466 $500
NC0334 #02 Y:2005 Adjust burners for efficient operation $2,870 $1,000
NC0334 #01 Y:2005 Increase amount of condensate returned $12,388 $7,290
MS0292 #05 Y:2005 Utilize energy-efficient belts and other improved mechanisms $953 $753
MS0292 #04 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $2,405 $231
MS0292 #03 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $4,836 $21,282
MS0292 #02 Y:2005 Utilize higher efficiency lamps and/or ballasts $8,311 $46,268
MS0292 #01 Y:2005 Utilize higher efficiency lamps and/or ballasts $14,743 $34,278
MI0126 #06 Y:2005 Modify process to reduce material use/cost $42,242 $140
MI0126 #05 Y:2005 Utilize energy-efficient belts and other improved mechanisms $1,474 -
MI0126 #04 Y:2005 Analyze flue gas for proper air/fuel ratio $1,497 $1,750
MI0126 #03 Y:2005 Reduce illumination to minimum necessary levels $6,331 $212
MI0126 #02 Y:2005 Install / repair insulation on steam lines $8,323 $1,020
MI0126 #01 Y:2005 Use waste heat from hot flue gases to preheat $17,617 $16,000
BD0306 #08 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,310 $900
BD0306 #07 Y:2005 Use most efficient type of electric motors $1,520 $4,820