166,657
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UF0113 #04 Y:1995 | 04 | 1995 | Utilize higher efficiency lamps and/or ballasts | $1,911 | $5,465 | |
| UF0113 #03 Y:1995 | 03 | 1995 | Use most efficient type of electric motors | $972 | $3,690 | |
| UF0113 #02 Y:1995 | 02 | 1995 | Re-arrange equipment layout to reduce labor costs | $4,588 | $84 | |
| UF0113 #01 Y:1995 | 01 | 1995 | Reschedule plant operations or reduce load to avoid peaks | $5,541 | $1,000 | |
| UF0112 #11 Y:1995 | 11 | 1995 | Optimize plant power factor | $2,841 | $12,951 | |
| UF0112 #10 Y:1995 | 10 | 1995 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,129 | $3,000 | |
| UF0112 #09 Y:1995 | 09 | 1995 | Utilize higher efficiency lamps and/or ballasts | $374 | $520 | |
| UF0112 #08 Y:1995 | 08 | 1995 | Replace existing hvac unit with high efficiency model | $208 | $950 | |
| UF0112 #07 Y:1995 | 07 | 1995 | Use adjustable frequency drive or multiple speed motors on existing system | $33,584 | $50,400 | |
| UF0112 #06 Y:1995 | 06 | 1995 | Utilize energy-efficient belts and other improved mechanisms | $6,316 | $1,500 | |
| UF0112 #05 Y:1995 | 05 | 1995 | Use most efficient type of electric motors | $29,665 | $30,154 | |
| UF0112 #04 Y:1995 | 04 | 1995 | Install occupancy sensors | $2,210 | $640 | |
| UF0112 #03 Y:1995 | 03 | 1995 | Utilize higher efficiency lamps and/or ballasts | $13,407 | $14,664 | |
| UF0112 #02 Y:1995 | 02 | 1995 | Utilize higher efficiency lamps and/or ballasts | $1,893 | $1,150 | |
| UF0112 #01 Y:1995 | 01 | 1995 | Utilize higher efficiency lamps and/or ballasts | $6,787 | $7,746 | |
| GT0549 #07 Y:1995 | 07 | 1995 | Use power during off-peak periods | $1,830 | $4,000 | |
| GT0549 #06 Y:1995 | 06 | 1995 | Insulate glazing, walls, ceilings, and roofs | $18,200 | $168,000 | |
| GT0549 #05 Y:1995 | 05 | 1995 | Replace electrically-operated equipment with fossil fuel equipment | $4,520 | $3,000 | |
| GT0549 #04 Y:1995 | 04 | 1995 | Use demand controller or load shedder | $19,500 | $24,000 | |
| GT0549 #03 Y:1995 | 03 | 1995 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,430 | $400 |