Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,040

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0297 #04 Y:2023 Insulate bare equipment $26,122 $13,370
IC0297 #03 Y:2023 Insulate bare equipment $2,641 $1,066
IC0297 #02 Y:2023 Insulate bare equipment $5,801 $2,620
IC0297 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $29,288 $1,336
MI0437 #05 Y:2023 Install occupancy sensors $441 $433
MI0437 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $28,425 $24,780
MI0437 #03 Y:2023 Change rate schedules or other changes in utility service $92,403 $2,400
MI0437 #02 Y:2023 Eliminate or reduce compressed air usage $127,058 $120
MI0437 #01 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $595,572 $1,797,720
UU0245 #04 Y:2023 Lower temperature during the winter season and vice-versa $299 $100
UU0245 #03 Y:2023 Reduce space conditioning during non-working hours $2,961 $3,200
UU0245 #02 Y:2023 Improve air circulation with destratification fans / other methods $5,693 $25,330
UU0245 #01 Y:2023 Replace fossil fuel equipment with electrical equipment $13,514 $18,000
MZ0356 #09 Y:2023 Replace treated water with well / surface water $10,677 $100,000
MZ0356 #08 Y:2023 Meter recycled water (to reduce sewer charges) $7,202 $7,540
MZ0356 #07 Y:2023 Clean or color roof to reduce solar load $135,000 $306,035
MZ0356 #06 Y:2023 Use solar heat to make electricty $525,252 $3,450,533
MZ0356 #05 Y:2023 Lower temperature during the winter season and vice-versa $6,120 $2,680
MZ0356 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $11,117 $14,802
MZ0356 #03 Y:2023 Recover waste heat from equipment $29,176 $63,400