Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,040

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0279 #04 Y:2023 Install timers and/or thermostats $3,760 $1,407
UA0279 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $15,760 $1,000
UA0279 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $21,676 $8,591
UA0279 #01 Y:2023 Install occupancy sensors $1,228 $2,262
KS2323 #05 Y:2023 Utilize energy-efficient belts and other improved mechanisms $1,339 $1,860
KS2323 #04 Y:2023 Use most efficient type of electric motors $2,542 $20,493
KS2323 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $223 $60
KS2323 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,211 $5,240
KS2323 #01 Y:2023 Use solar heat to make electricty $105,434 $423,259
CC0023 #03 Y:2023 Use solar heat to make electricty $147,864 $750,960
CC0023 #02 Y:2023 Install outside air damper / economizer on hvac unit $12,633 $40,000
CC0023 #01 Y:2023 Use cooling tower water instead of refrigeration $55,102 $47,144
WM0207 #05 Y:2023 Utilize energy-efficient belts and other improved mechanisms $1,225 $1,100
WM0207 #04 Y:2023 Install occupancy sensors $3,129 $540
WM0207 #03 Y:2023 Install compressor air intakes in coolest locations $3,619 $4,084
WM0207 #02 Y:2023 Meter recycled water (to reduce sewer charges) $16,759 $2,500
WM0207 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $19,028 $12,825
NT0020 #07 Y:2023 Replace existing hvac unit with high efficiency model $113,865 $96,040
NT0020 #06 Y:2023 Apply for investment incentives $52,462 -
NT0020 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $27,816 $16,551