Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,004

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0191 #05 Y:2022 Reduce the pressure of compressed air to the minimum required $733 -
WM0191 #04 Y:2022 Utilize energy-efficient belts and other improved mechanisms $1,985 $2,600
WM0191 #03 Y:2022 Recover heat from exhausted steam, hot air or hot water $2,392 $5,000
WM0191 #02 Y:2022 Replace electrically-operated equipment with fossil fuel equipment $16,731 $32,670
WM0191 #01 Y:2022 Use solar heat to make electricty $25,222 $237,351
UF0588 #07 Y:2022 Improve space comfort conditioning $9,728 $4,480
UF0588 #06 Y:2022 Utilize energy-efficient belts and other improved mechanisms $1,352 -
UF0588 #05 Y:2022 Improve air circulation with destratification fans / other methods $14,162 $12,350
UF0588 #04 Y:2022 Utilize higher efficiency lamps and/or ballasts $17,751 $17,178
UF0588 #03 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $22,121 $756
UF0588 #02 Y:2022 Use demand controller or load shedder $84,856 $35,131
UF0588 #01 Y:2022 Use solar heat to make electricty $91,215 $297,040
SD0627 #09 Y:2022 Use solar heat to make electricty $74,599 $327,726
SD0627 #08 Y:2022 Use most efficient type of electric motors $17,281 $41,842
SD0627 #07 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $776 $1,200
SD0627 #06 Y:2022 Utilize higher efficiency lamps and/or ballasts $2,072 $2,788
SD0627 #05 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $7,101 $9,714
SD0627 #04 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $4,584 $7,660
SD0627 #03 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $53,383 $164,701
SD0627 #02 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $12,041 $48,250