4,004
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SU0524 #06 Y:2022 | 06 | 2022 | Reduce ventilation air | $314 | $510 | |
| SU0524 #05 Y:2022 | 05 | 2022 | Install compressor air intakes in coolest locations | $525 | $462 | |
| SU0524 #04 Y:2022 | 04 | 2022 | Reschedule plant operations or reduce load to avoid peaks | $1,422 | $650 | |
| SU0524 #03 Y:2022 | 03 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,106 | $875 | |
| SU0524 #02 Y:2022 | 02 | 2022 | Utilize higher efficiency lamps and/or ballasts | $12,837 | $2,064 | |
| SU0524 #01 Y:2022 | 01 | 2022 | Eliminate or reduce compressed air usage | $1,266 | - | |
| MS0406 #03 Y:2022 | 03 | 2022 | Turn off equipment when not in use | $5,220 | - | |
| MS0406 #02 Y:2022 | 02 | 2022 | Reduce the pressure of compressed air to the minimum required | $1,570 | - | |
| MS0406 #01 Y:2022 | 01 | 2022 | Replace boiler | $17,347 | $165,000 | |
| AM0862 #06 Y:2022 | 06 | 2022 | Reduce excessive boiler blowdown | $1,203 | $4,750 | |
| AM0862 #05 Y:2022 | 05 | 2022 | Utilize higher efficiency lamps and/or ballasts | $4,080 | $16,563 | |
| AM0862 #04 Y:2022 | 04 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $8,300 | $9,000 | |
| AM0862 #03 Y:2022 | 03 | 2022 | Repair and eliminate steam leaks | $18,325 | $6,300 | |
| AM0862 #02 Y:2022 | 02 | 2022 | Optimize plant power factor | $27,516 | $41,926 | |
| AM0862 #01 Y:2022 | 01 | 2022 | Repair or replace steam traps | $80,175 | $8,170 | |
| UW2209 #05 Y:2022 | 05 | 2022 | Use most efficient type of electric motors | $814 | $3,411 | |
| UW2209 #04 Y:2022 | 04 | 2022 | Reduce space conditioning during non-working hours | $2,276 | - | |
| UW2209 #03 Y:2022 | 03 | 2022 | Install occupancy sensors | $2,927 | $1,771 | |
| UW2209 #02 Y:2022 | 02 | 2022 | Utilize higher efficiency lamps and/or ballasts | $2,845 | $6,616 | |
| UW2209 #01 Y:2022 | 01 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,907 | $2,080 |