Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,781

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1019 #05 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $28,713 $11,014
UD1019 #04 Y:2020 Meter recycled water (to reduce sewer charges) $9,326 $1,400
UD1019 #03 Y:2020 Reduce the pressure of compressed air to the minimum required $4,086 -
UD1019 #02 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $4,924 $1,000
UD1019 #01 Y:2020 Analyze flue gas for proper air/fuel ratio $2,684 -
MZ0288 #05 Y:2020 Recover waste heat from equipment $424 $430
MZ0288 #04 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $1,502 $3,320
MZ0288 #03 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $1,574 $1,660
MZ0288 #02 Y:2020 Reschedule plant operations or reduce load to avoid peaks $6,118 $3,400
MZ0288 #01 Y:2020 Utilize higher efficiency lamps and/or ballasts $15,689 $41,089
NL0051 #07 Y:2020 Install occupancy sensors $418 $1,250
NL0051 #06 Y:2020 Eliminate leaks in water lines and valves $435 $85
NL0051 #05 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $631 $500
NL0051 #04 Y:2020 Use most efficient type of electric motors $3,333 $13,737
NL0051 #03 Y:2020 Utilize energy-efficient belts and other improved mechanisms $5,482 $984
NL0051 #02 Y:2020 Replace obsolete burners with more efficient ones $12,899 $13,024
NL0051 #01 Y:2020 Reschedule plant operations or reduce load to avoid peaks $24,034 $128
AS0490 #05 Y:2020 Utilize higher efficiency lamps and/or ballasts $891 $397
AS0490 #04 Y:2020 Keep equipment clean $991 $464
AS0490 #03 Y:2020 Analyze flue gas for proper air/fuel ratio $2,729 $410