1,781
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1019 #05 Y:2020 | 05 | 2020 | Use adjustable frequency drive or multiple speed motors on existing system | $28,713 | $11,014 | |
| UD1019 #04 Y:2020 | 04 | 2020 | Meter recycled water (to reduce sewer charges) | $9,326 | $1,400 | |
| UD1019 #03 Y:2020 | 03 | 2020 | Reduce the pressure of compressed air to the minimum required | $4,086 | - | |
| UD1019 #02 Y:2020 | 02 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,924 | $1,000 | |
| UD1019 #01 Y:2020 | 01 | 2020 | Analyze flue gas for proper air/fuel ratio | $2,684 | - | |
| MZ0288 #05 Y:2020 | 05 | 2020 | Recover waste heat from equipment | $424 | $430 | |
| MZ0288 #04 Y:2020 | 04 | 2020 | Use adjustable frequency drive or multiple speed motors on existing system | $1,502 | $3,320 | |
| MZ0288 #03 Y:2020 | 03 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,574 | $1,660 | |
| MZ0288 #02 Y:2020 | 02 | 2020 | Reschedule plant operations or reduce load to avoid peaks | $6,118 | $3,400 | |
| MZ0288 #01 Y:2020 | 01 | 2020 | Utilize higher efficiency lamps and/or ballasts | $15,689 | $41,089 | |
| NL0051 #07 Y:2020 | 07 | 2020 | Install occupancy sensors | $418 | $1,250 | |
| NL0051 #06 Y:2020 | 06 | 2020 | Eliminate leaks in water lines and valves | $435 | $85 | |
| NL0051 #05 Y:2020 | 05 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $631 | $500 | |
| NL0051 #04 Y:2020 | 04 | 2020 | Use most efficient type of electric motors | $3,333 | $13,737 | |
| NL0051 #03 Y:2020 | 03 | 2020 | Utilize energy-efficient belts and other improved mechanisms | $5,482 | $984 | |
| NL0051 #02 Y:2020 | 02 | 2020 | Replace obsolete burners with more efficient ones | $12,899 | $13,024 | |
| NL0051 #01 Y:2020 | 01 | 2020 | Reschedule plant operations or reduce load to avoid peaks | $24,034 | $128 | |
| AS0490 #05 Y:2020 | 05 | 2020 | Utilize higher efficiency lamps and/or ballasts | $891 | $397 | |
| AS0490 #04 Y:2020 | 04 | 2020 | Keep equipment clean | $991 | $464 | |
| AS0490 #03 Y:2020 | 03 | 2020 | Analyze flue gas for proper air/fuel ratio | $2,729 | $410 |