Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,781

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0297 #04 Y:2020 Install occupancy sensors $320 $840
MZ0297 #03 Y:2020 Optimize plant power factor $7,129 $24,780
MZ0297 #02 Y:2020 Reduce the pressure of compressed air to the minimum required $773 $320
MZ0297 #01 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $22,041 $51,700
UU0171 #04 Y:2020 Reduce the pressure of compressed air to the minimum required $1,725 $1,500
UU0171 #03 Y:2020 Change rate schedules or other changes in utility service $6,190 $1,100
UU0171 #02 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $6,969 $4,000
UU0171 #01 Y:2020 Eliminate/reduce an operation $43,211 $85,000
UK2002 #05 Y:2020 Change procedures / equipment / operating conditions $17,165 -
UK2002 #04 Y:2020 Utilize controls to operate equipment only when needed $460 -
UK2002 #03 Y:2020 Establish equipment maintenance schedule $800 -
UK2002 #02 Y:2020 Utilize energy-efficient belts and other improved mechanisms $473 $160
UK2002 #01 Y:2020 Utilize higher efficiency lamps and/or ballasts $1,770 $2,473
TT0243 #06 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $7,111 $600
TT0243 #05 Y:2020 Utilize energy-efficient belts and other improved mechanisms $36,281 $7,500
TT0243 #04 Y:2020 Recover waste heat from equipment $45,344 $83,600
TT0243 #03 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $63,580 $248,619
TT0243 #02 Y:2020 Reschedule plant operations or reduce load to avoid peaks $84,184 $2,000
TT0243 #01 Y:2020 Utilize higher efficiency lamps and/or ballasts $294,548 $574,658
SF0557 #04 Y:2020 Remove or close off unneeded compressed air lines $1,850 $4,249