1,781
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MZ0297 #04 Y:2020 | 04 | 2020 | Install occupancy sensors | $320 | $840 | |
| MZ0297 #03 Y:2020 | 03 | 2020 | Optimize plant power factor | $7,129 | $24,780 | |
| MZ0297 #02 Y:2020 | 02 | 2020 | Reduce the pressure of compressed air to the minimum required | $773 | $320 | |
| MZ0297 #01 Y:2020 | 01 | 2020 | Use adjustable frequency drive or multiple speed motors on existing system | $22,041 | $51,700 | |
| UU0171 #04 Y:2020 | 04 | 2020 | Reduce the pressure of compressed air to the minimum required | $1,725 | $1,500 | |
| UU0171 #03 Y:2020 | 03 | 2020 | Change rate schedules or other changes in utility service | $6,190 | $1,100 | |
| UU0171 #02 Y:2020 | 02 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,969 | $4,000 | |
| UU0171 #01 Y:2020 | 01 | 2020 | Eliminate/reduce an operation | $43,211 | $85,000 | |
| UK2002 #05 Y:2020 | 05 | 2020 | Change procedures / equipment / operating conditions | $17,165 | - | |
| UK2002 #04 Y:2020 | 04 | 2020 | Utilize controls to operate equipment only when needed | $460 | - | |
| UK2002 #03 Y:2020 | 03 | 2020 | Establish equipment maintenance schedule | $800 | - | |
| UK2002 #02 Y:2020 | 02 | 2020 | Utilize energy-efficient belts and other improved mechanisms | $473 | $160 | |
| UK2002 #01 Y:2020 | 01 | 2020 | Utilize higher efficiency lamps and/or ballasts | $1,770 | $2,473 | |
| TT0243 #06 Y:2020 | 06 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,111 | $600 | |
| TT0243 #05 Y:2020 | 05 | 2020 | Utilize energy-efficient belts and other improved mechanisms | $36,281 | $7,500 | |
| TT0243 #04 Y:2020 | 04 | 2020 | Recover waste heat from equipment | $45,344 | $83,600 | |
| TT0243 #03 Y:2020 | 03 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $63,580 | $248,619 | |
| TT0243 #02 Y:2020 | 02 | 2020 | Reschedule plant operations or reduce load to avoid peaks | $84,184 | $2,000 | |
| TT0243 #01 Y:2020 | 01 | 2020 | Utilize higher efficiency lamps and/or ballasts | $294,548 | $574,658 | |
| SF0557 #04 Y:2020 | 04 | 2020 | Remove or close off unneeded compressed air lines | $1,850 | $4,249 |