Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,649

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0303 #03 Y:2016 Install vinyl strip / high speed / air curtain doors $6,338 $4,536
MI0303 #02 Y:2016 Minimize water usage $6,896 $7,439
MI0303 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $7,192 $28,975
TT0181 #10 Y:2016 Optimize plant power factor $3,012 $8,000
TT0181 #09 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $3,058 $3,050
TT0181 #08 Y:2016 Recover waste heat from equipment $3,794 $500
TT0181 #07 Y:2016 Utilize higher efficiency lamps and/or ballasts $3,976 $13,245
TT0181 #06 Y:2016 Recover waste heat from equipment $6,973 $6,000
TT0181 #05 Y:2016 Eliminate or reduce compressed air usage $7,573 $7,000
TT0181 #04 Y:2016 Insulate bare equipment $12,441 $27,333
TT0181 #03 Y:2016 Eliminate or reduce compressed air usage $25,164 $10,000
TT0181 #02 Y:2016 Insulate bare equipment $31,353 $38,924
TT0181 #01 Y:2016 Recover waste heat from equipment $35,984 $24,000
SU0422 #08 Y:2016 Utilize higher efficiency lamps and/or ballasts $13,567 $25,530
SU0422 #07 Y:2016 Conserve energy by efficient use of vending machines $189 $332
SU0422 #06 Y:2016 Reduce ventilation air $846 $880
SU0422 #05 Y:2016 Eliminate/reduce an operation $880 $960
SU0422 #04 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $153 $150
SU0422 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $484 $164
SU0422 #02 Y:2016 Reduce the pressure of compressed air to the minimum required $450 -