3,649
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0591 #02 Y:2016 | 02 | 2016 | Utilize higher efficiency lamps and/or ballasts | $1,501 | $4,590 | |
| NC0591 #01 Y:2016 | 01 | 2016 | Utilize higher efficiency lamps and/or ballasts | $30,408 | $87,579 | |
| WV0541 #09 Y:2016 | 09 | 2016 | Install occupancy sensors | $869 | $1,671 | |
| WV0541 #08 Y:2016 | 08 | 2016 | Use evaporation to concentrate material | $1,206 | $5,500 | |
| WV0541 #07 Y:2016 | 07 | 2016 | Insulate bare equipment | $3,860 | $2,024 | |
| WV0541 #06 Y:2016 | 06 | 2016 | Develop a repair/replace policy | $13,353 | $1,514 | |
| WV0541 #05 Y:2016 | 05 | 2016 | Recover waste heat from equipment | $29,320 | $72,000 | |
| WV0541 #04 Y:2016 | 04 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $35,042 | $29,880 | |
| WV0541 #03 Y:2016 | 03 | 2016 | Reduce the pressure of compressed air to the minimum required | $40,630 | $534 | |
| WV0541 #02 Y:2016 | 02 | 2016 | Install sensors to detect defects | $60,138 | $100,000 | |
| WV0541 #01 Y:2016 | 01 | 2016 | Utilize higher efficiency lamps and/or ballasts | $62,969 | $252,894 | |
| UK1613 #10 Y:2016 | 10 | 2016 | Utilize controls to operate equipment only when needed | $145 | - | |
| UK1613 #09 Y:2016 | 09 | 2016 | Use only certified motor repair shops | $478 | $756 | |
| UK1613 #08 Y:2016 | 08 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $535 | - | |
| UK1613 #07 Y:2016 | 07 | 2016 | Reduce the pressure of compressed air to the minimum required | $871 | - | |
| UK1613 #06 Y:2016 | 06 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,264 | $1,200 | |
| UK1613 #05 Y:2016 | 05 | 2016 | Install occupancy sensors | $3,544 | $1,386 | |
| UK1613 #04 Y:2016 | 04 | 2016 | Preheat combustion air with waste heat | $3,332 | $4,602 | |
| UK1613 #03 Y:2016 | 03 | 2016 | Preheat combustion air with waste heat | $1,962 | $4,550 | |
| UK1613 #02 Y:2016 | 02 | 2016 | Analyze flue gas for proper air/fuel ratio | $8,671 | - |