4,240
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MZ0190 #06 Y:2015 | 06 | 2015 | Eliminate/reduce an operation | $928 | - | |
| MZ0190 #05 Y:2015 | 05 | 2015 | Recover waste heat from equipment | $3,663 | $1,500 | |
| MZ0190 #04 Y:2015 | 04 | 2015 | Install compressor air intakes in coolest locations | $2,095 | $3,500 | |
| MZ0190 #03 Y:2015 | 03 | 2015 | Develop standard procedures to improve internal yields | $20,868 | $40,000 | |
| MZ0190 #02 Y:2015 | 02 | 2015 | Condense operation into one building | $12,608 | - | |
| MZ0190 #01 Y:2015 | 01 | 2015 | Replace heat treating oven with more efficient unit | $36,633 | $120,000 | |
| MI0286 #09 Y:2015 | 09 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $920 | $1,670 | |
| MI0286 #08 Y:2015 | 08 | 2015 | Reduce the pressure of compressed air to the minimum required | $1,382 | $40 | |
| MI0286 #07 Y:2015 | 07 | 2015 | Eliminate or reduce compressed air usage | $3,433 | $5,370 | |
| MI0286 #06 Y:2015 | 06 | 2015 | Install partitions to reduce size of conditioned space | $3,819 | $11,872 | |
| MI0286 #05 Y:2015 | 05 | 2015 | Use optimum size and capacity equipment | $5,778 | $4,691 | |
| MI0286 #04 Y:2015 | 04 | 2015 | Recover waste heat from equipment | $7,447 | $6,660 | |
| MI0286 #03 Y:2015 | 03 | 2015 | Lower temperature during the winter season and vice-versa | $12,602 | $80 | |
| MI0286 #02 Y:2015 | 02 | 2015 | Lower ceiling to reduce conditioned space | $14,710 | $100,350 | |
| MI0286 #01 Y:2015 | 01 | 2015 | Clean or color roof to reduce solar load | $19,094 | $29,862 | |
| DL0153 #06 Y:2015 | 06 | 2015 | Utilize higher efficiency lamps and/or ballasts | $2,260 | $10,000 | |
| DL0153 #05 Y:2015 | 05 | 2015 | Utilize higher efficiency lamps and/or ballasts | $190 | $500 | |
| DL0153 #04 Y:2015 | 04 | 2015 | Utilize higher efficiency lamps and/or ballasts | $1,150 | $1,500 | |
| DL0153 #03 Y:2015 | 03 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,020 | $1,000 | |
| DL0153 #02 Y:2015 | 02 | 2015 | Reduce fluid flow rates | $13,200 | $10,000 |