4,240
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SU0397 #01 Y:2015 | 01 | 2015 | Utilize higher efficiency lamps and/or ballasts | $630 | $552 | |
| OR0662 #07 Y:2015 | 07 | 2015 | Utilize higher efficiency lamps and/or ballasts | $15,058 | $67,152 | |
| OR0662 #06 Y:2015 | 06 | 2015 | Turn off equipment during breaks, reduce operating time | $1,080 | $302 | |
| OR0662 #05 Y:2015 | 05 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,683 | $6,683 | |
| OR0662 #04 Y:2015 | 04 | 2015 | Redesign flow to minimize mass transfer length | $2,998 | $864 | |
| OR0662 #03 Y:2015 | 03 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $7,567 | - | |
| OR0662 #02 Y:2015 | 02 | 2015 | Replace existing equipment with more suitable substitutes | $15,820 | $2,500 | |
| OR0662 #01 Y:2015 | 01 | 2015 | Replace old machine with new automatic multi-station tool | $41,305 | $102,204 | |
| MZ0171 #05 Y:2015 | 05 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,558 | $870 | |
| MZ0171 #04 Y:2015 | 04 | 2015 | Install occupancy sensors | $2,783 | $880 | |
| MZ0171 #03 Y:2015 | 03 | 2015 | Utilize higher efficiency lamps and/or ballasts | $1,759 | $3,900 | |
| MZ0171 #02 Y:2015 | 02 | 2015 | Lower temperature during the winter season and vice-versa | $8,781 | - | |
| MZ0171 #01 Y:2015 | 01 | 2015 | Air condition only space necessary | $1,588 | - | |
| BS0066 #08 Y:2015 | 08 | 2015 | Minimize water usage | $702 | $5,938 | |
| BS0066 #07 Y:2015 | 07 | 2015 | Optimize plant power factor | $12,093 | $25,245 | |
| BS0066 #06 Y:2015 | 06 | 2015 | Purchase new equipment to reduce material use / cost | $13,061 | $19,065 | |
| BS0066 #05 Y:2015 | 05 | 2015 | Combine utility meters | $258 | $253 | |
| BS0066 #04 Y:2015 | 04 | 2015 | Use a less expensive method of waste removal | $1,249 | $80 | |
| BS0066 #03 Y:2015 | 03 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,219 | $907 | |
| BS0066 #02 Y:2015 | 02 | 2015 | Reduce space conditioning during non-working hours | $1,531 | $26 |