Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,240

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0397 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $630 $552
OR0662 #07 Y:2015 Utilize higher efficiency lamps and/or ballasts $15,058 $67,152
OR0662 #06 Y:2015 Turn off equipment during breaks, reduce operating time $1,080 $302
OR0662 #05 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $5,683 $6,683
OR0662 #04 Y:2015 Redesign flow to minimize mass transfer length $2,998 $864
OR0662 #03 Y:2015 Utilize energy-efficient belts and other improved mechanisms $7,567 -
OR0662 #02 Y:2015 Replace existing equipment with more suitable substitutes $15,820 $2,500
OR0662 #01 Y:2015 Replace old machine with new automatic multi-station tool $41,305 $102,204
MZ0171 #05 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $2,558 $870
MZ0171 #04 Y:2015 Install occupancy sensors $2,783 $880
MZ0171 #03 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,759 $3,900
MZ0171 #02 Y:2015 Lower temperature during the winter season and vice-versa $8,781 -
MZ0171 #01 Y:2015 Air condition only space necessary $1,588 -
BS0066 #08 Y:2015 Minimize water usage $702 $5,938
BS0066 #07 Y:2015 Optimize plant power factor $12,093 $25,245
BS0066 #06 Y:2015 Purchase new equipment to reduce material use / cost $13,061 $19,065
BS0066 #05 Y:2015 Combine utility meters $258 $253
BS0066 #04 Y:2015 Use a less expensive method of waste removal $1,249 $80
BS0066 #03 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $1,219 $907
BS0066 #02 Y:2015 Reduce space conditioning during non-working hours $1,531 $26