Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,240

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0162 #05 Y:2015 Turn off equipment during breaks, reduce operating time $1,940 $510
DL0162 #04 Y:2015 Turn off equipment when not in use $3,605 $800
DL0162 #03 Y:2015 Reduce ventilation air $2,430 $340
DL0162 #02 Y:2015 Turn off equipment during breaks, reduce operating time $7,660 -
DL0162 #01 Y:2015 Reduce space conditioning during non-working hours $22,170 -
WM0082 #08 Y:2015 Use synthetic lubricant $2,423 $9,400
WM0082 #07 Y:2015 Utilize energy-efficient belts and other improved mechanisms $7,050 $1,650
WM0082 #06 Y:2015 Cool compressor air intake with heat exchanger $5,896 $2,068
WM0082 #05 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $4,792 $280
WM0082 #04 Y:2015 Install occupancy sensors $5,195 $825
WM0082 #03 Y:2015 Utilize higher efficiency lamps and/or ballasts $3,011 $3,340
WM0082 #02 Y:2015 Utilize higher efficiency lamps and/or ballasts $21,220 $23,066
WM0082 #01 Y:2015 Recover waste heat from equipment $15,282 $26,000
UD0943 #09 Y:2015 Contract a wood pallet recycling company $12,350 -
UD0943 #08 Y:2015 Develop a repair/replace policy $411 $2,031
UD0943 #07 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $1,294 $4,525
UD0943 #06 Y:2015 Use waste heat to produce steam to drive a steam turbine-generator $24,866 $81,180
UD0943 #05 Y:2015 Eliminate or reduce compressed air usage $196 $800
UD0943 #04 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $620 -
UD0943 #03 Y:2015 Reduce the pressure of compressed air to the minimum required $1,300 -