Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,240

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0411 #08 Y:2015 Replace existing chiller with high efficiency model $58,696 $100,000
LE0411 #07 Y:2015 Install / repair insulation on steam lines $1,450 $1,450
LE0411 #06 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $1,675 $1,000
LE0411 #05 Y:2015 Insulate bare equipment $21,409 $9,106
LE0411 #04 Y:2015 Install timers and/or thermostats $3,292 $625
LE0411 #03 Y:2015 Turn off equipment when not in use $3,533 $150
LE0411 #02 Y:2015 Analyze flue gas for proper air/fuel ratio $16,142 $25
LE0411 #01 Y:2015 Install timers and/or thermostats $22 -
CO0719 #03 Y:2015 Utilize an evaporative air pre-cooler or other heat exchanger in ac system $6,380 $48,350
CO0719 #02 Y:2015 Utilize higher efficiency lamps and/or ballasts $9,060 $50,310
CO0719 #01 Y:2015 Utilize energy-efficient belts and other improved mechanisms $1,840 $3,490
OK0934 #06 Y:2015 Reschedule plant operations or reduce load to avoid peaks $8,069 $10,000
OK0934 #05 Y:2015 Reschedule plant operations or reduce load to avoid peaks $11,990 -
OK0934 #04 Y:2015 Insulate bare equipment $63,243 $3,161
OK0934 #03 Y:2015 Eliminate cooling of process streams which subsequently must be heated and vice versa $134,039 $1,300
OK0934 #02 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $8,615 $915
OK0934 #01 Y:2015 Use cooling tower or economizer to replace chiller cooling $27,456 $25,000
DL0162 #08 Y:2015 Utilize higher efficiency lamps and/or ballasts $7,930 $29,230
DL0162 #07 Y:2015 Utilize controls to operate equipment only when needed $1,730 $1,820
DL0162 #06 Y:2015 Replace city water with recycled water via cooling tower $18,175 $10,500