4,240
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0411 #08 Y:2015 | 08 | 2015 | Replace existing chiller with high efficiency model | $58,696 | $100,000 | |
| LE0411 #07 Y:2015 | 07 | 2015 | Install / repair insulation on steam lines | $1,450 | $1,450 | |
| LE0411 #06 Y:2015 | 06 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,675 | $1,000 | |
| LE0411 #05 Y:2015 | 05 | 2015 | Insulate bare equipment | $21,409 | $9,106 | |
| LE0411 #04 Y:2015 | 04 | 2015 | Install timers and/or thermostats | $3,292 | $625 | |
| LE0411 #03 Y:2015 | 03 | 2015 | Turn off equipment when not in use | $3,533 | $150 | |
| LE0411 #02 Y:2015 | 02 | 2015 | Analyze flue gas for proper air/fuel ratio | $16,142 | $25 | |
| LE0411 #01 Y:2015 | 01 | 2015 | Install timers and/or thermostats | $22 | - | |
| CO0719 #03 Y:2015 | 03 | 2015 | Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $6,380 | $48,350 | |
| CO0719 #02 Y:2015 | 02 | 2015 | Utilize higher efficiency lamps and/or ballasts | $9,060 | $50,310 | |
| CO0719 #01 Y:2015 | 01 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $1,840 | $3,490 | |
| OK0934 #06 Y:2015 | 06 | 2015 | Reschedule plant operations or reduce load to avoid peaks | $8,069 | $10,000 | |
| OK0934 #05 Y:2015 | 05 | 2015 | Reschedule plant operations or reduce load to avoid peaks | $11,990 | - | |
| OK0934 #04 Y:2015 | 04 | 2015 | Insulate bare equipment | $63,243 | $3,161 | |
| OK0934 #03 Y:2015 | 03 | 2015 | Eliminate cooling of process streams which subsequently must be heated and vice versa | $134,039 | $1,300 | |
| OK0934 #02 Y:2015 | 02 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $8,615 | $915 | |
| OK0934 #01 Y:2015 | 01 | 2015 | Use cooling tower or economizer to replace chiller cooling | $27,456 | $25,000 | |
| DL0162 #08 Y:2015 | 08 | 2015 | Utilize higher efficiency lamps and/or ballasts | $7,930 | $29,230 | |
| DL0162 #07 Y:2015 | 07 | 2015 | Utilize controls to operate equipment only when needed | $1,730 | $1,820 | |
| DL0162 #06 Y:2015 | 06 | 2015 | Replace city water with recycled water via cooling tower | $18,175 | $10,500 |