4,240
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IP0059 #06 Y:2015 | 06 | 2015 | Insulate bare equipment | $257 | $776 | |
| IP0059 #05 Y:2015 | 05 | 2015 | Install occupancy sensors | $1,345 | $3,616 | |
| IP0059 #04 Y:2015 | 04 | 2015 | Apply for investment incentives | $1,633 | $2,000 | |
| IP0059 #03 Y:2015 | 03 | 2015 | Use or replace with energy efficient substitutes | $76 | $62 | |
| IP0059 #02 Y:2015 | 02 | 2015 | Lower temperature during the winter season and vice-versa | $1,602 | $99 | |
| IP0059 #01 Y:2015 | 01 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,353 | $58 | |
| WV0519 #11 Y:2015 | 11 | 2015 | Insulate bare equipment | $247 | $439 | |
| WV0519 #10 Y:2015 | 10 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $3,228 | - | |
| WV0519 #09 Y:2015 | 09 | 2015 | Reduce the pressure of compressed air to the minimum required | $3,944 | $155 | |
| WV0519 #08 Y:2015 | 08 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,974 | $333 | |
| WV0519 #07 Y:2015 | 07 | 2015 | Eliminate or reduce compressed air usage | $5,404 | $4,258 | |
| WV0519 #06 Y:2015 | 06 | 2015 | Develop a repair/replace policy | $9,710 | $691 | |
| WV0519 #05 Y:2015 | 05 | 2015 | Utilize higher efficiency lamps and/or ballasts | $32,274 | $33,606 | |
| WV0519 #04 Y:2015 | 04 | 2015 | Establish a predictive maintenance program | $45,119 | $1,000 | |
| WV0519 #03 Y:2015 | 03 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $45,853 | $50,000 | |
| WV0519 #02 Y:2015 | 02 | 2015 | Upgrade controls on compressors | $49,713 | $8,500 | |
| WV0519 #01 Y:2015 | 01 | 2015 | Use waste heat from hot flue gases to preheat | $161,462 | $330,000 | |
| LE0411 #11 Y:2015 | 11 | 2015 | Utilize higher efficiency lamps and/or ballasts | $3,246 | $16,912 | |
| LE0411 #10 Y:2015 | 10 | 2015 | Use waste heat from hot flue gases to generate steam | $102,584 | $458,390 | |
| LE0411 #09 Y:2015 | 09 | 2015 | Use optimum size and capacity equipment | $2,849 | $6,000 |