Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,240

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0059 #06 Y:2015 Insulate bare equipment $257 $776
IP0059 #05 Y:2015 Install occupancy sensors $1,345 $3,616
IP0059 #04 Y:2015 Apply for investment incentives $1,633 $2,000
IP0059 #03 Y:2015 Use or replace with energy efficient substitutes $76 $62
IP0059 #02 Y:2015 Lower temperature during the winter season and vice-versa $1,602 $99
IP0059 #01 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $1,353 $58
WV0519 #11 Y:2015 Insulate bare equipment $247 $439
WV0519 #10 Y:2015 Utilize energy-efficient belts and other improved mechanisms $3,228 -
WV0519 #09 Y:2015 Reduce the pressure of compressed air to the minimum required $3,944 $155
WV0519 #08 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $4,974 $333
WV0519 #07 Y:2015 Eliminate or reduce compressed air usage $5,404 $4,258
WV0519 #06 Y:2015 Develop a repair/replace policy $9,710 $691
WV0519 #05 Y:2015 Utilize higher efficiency lamps and/or ballasts $32,274 $33,606
WV0519 #04 Y:2015 Establish a predictive maintenance program $45,119 $1,000
WV0519 #03 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $45,853 $50,000
WV0519 #02 Y:2015 Upgrade controls on compressors $49,713 $8,500
WV0519 #01 Y:2015 Use waste heat from hot flue gases to preheat $161,462 $330,000
LE0411 #11 Y:2015 Utilize higher efficiency lamps and/or ballasts $3,246 $16,912
LE0411 #10 Y:2015 Use waste heat from hot flue gases to generate steam $102,584 $458,390
LE0411 #09 Y:2015 Use optimum size and capacity equipment $2,849 $6,000