Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,240

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0292 #05 Y:2015 Install occupancy sensors $4,106 $884
MI0292 #04 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $8,028 $8,642
MI0292 #03 Y:2015 Reduce the pressure of compressed air to the minimum required $8,974 $40
MI0292 #02 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $30,595 $1,660
MI0292 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $38,353 $95,355
WV0520 #10 Y:2015 Utilize higher efficiency lamps and/or ballasts $279 $384
WV0520 #09 Y:2015 Eliminate or reduce compressed air usage $461 $428
WV0520 #08 Y:2015 Install compressor air intakes in coolest locations $773 $1,420
WV0520 #07 Y:2015 Develop a repair/replace policy $780 $1,156
WV0520 #06 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,809 $1,589
WV0520 #05 Y:2015 Optimize plant power factor $1,776 $5,830
WV0520 #04 Y:2015 Install vinyl strip / high speed / air curtain doors $1,924 $1,187
WV0520 #03 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $4,037 $370
WV0520 #02 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $4,194 $11,813
WV0520 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $32,234 $120,094
OR0667 #05 Y:2015 Use solar heat to make electricty $9,526 $71,973
OR0667 #04 Y:2015 Utilize higher efficiency lamps and/or ballasts $15,475 $35,460
OR0667 #03 Y:2015 Utilize energy-efficient belts and other improved mechanisms $1,538 -
OR0667 #02 Y:2015 Use waste heat from hot flue gases to preheat $3,990 $8,335
OR0667 #01 Y:2015 Reduce fluid flow rates $18,192 $21,600