Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,666

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BS0043 #02 Y:2014 Insulate bare equipment $8,916 $19,760
BS0043 #01 Y:2014 Modify refrigeration system to operate at a lower pressure $63,855 $15,000
MZ0158 #05 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $5,484 $1,525
MZ0158 #04 Y:2014 Install outside air damper / economizer on hvac unit $6,802 $13,500
MZ0158 #03 Y:2014 Reduce the pressure of compressed air to the minimum required $9,912 $5,470
MZ0158 #02 Y:2014 Install compressor air intakes in coolest locations $11,949 $2,100
MZ0158 #01 Y:2014 Recover waste heat from equipment $24,805 $8,100
UD0913 #12 Y:2014 Treat and reuse rinse waters $15,837 $10,000
UD0913 #11 Y:2014 Use decanting, flotation to remove contaminants $27,921 $55,000
UD0913 #10 Y:2014 Use closed cycle process to minimize waste water production $414,555 $27,000
UD0913 #09 Y:2014 Install automatic stack damper $2,665 -
UD0913 #08 Y:2014 Cover open tanks $3,270 $6,780
UD0913 #07 Y:2014 Use waste heat from hot flue gases to preheat $4,485 $5,000
UD0913 #06 Y:2014 Replace boiler $19,697 $163,500
UD0913 #05 Y:2014 Eliminate cooling of process streams which subsequently must be heated and vice versa $1,623 $7,000
UD0913 #04 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $2,643 $8,500
UD0913 #03 Y:2014 Utilize daylight whenever possible in lieu of artificial light $511 $1,275
UD0913 #02 Y:2014 Install occupancy sensors $615 $570
UD0913 #01 Y:2014 Upgrade conveyors $528 $255
NC0529 #09 Y:2014 Reduce illumination to minimum necessary levels $38 $63