| BS0043 #02 Y:2014 | 02 | 2014 | Insulate bare equipment | $8,916 | $19,760 | |
| BS0043 #01 Y:2014 | 01 | 2014 | Modify refrigeration system to operate at a lower pressure | $63,855 | $15,000 | |
| MZ0158 #05 Y:2014 | 05 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,484 | $1,525 | |
| MZ0158 #04 Y:2014 | 04 | 2014 | Install outside air damper / economizer on hvac unit | $6,802 | $13,500 | |
| MZ0158 #03 Y:2014 | 03 | 2014 | Reduce the pressure of compressed air to the minimum required | $9,912 | $5,470 | |
| MZ0158 #02 Y:2014 | 02 | 2014 | Install compressor air intakes in coolest locations | $11,949 | $2,100 | |
| MZ0158 #01 Y:2014 | 01 | 2014 | Recover waste heat from equipment | $24,805 | $8,100 | |
| UD0913 #12 Y:2014 | 12 | 2014 | Treat and reuse rinse waters | $15,837 | $10,000 | |
| UD0913 #11 Y:2014 | 11 | 2014 | Use decanting, flotation to remove contaminants | $27,921 | $55,000 | |
| UD0913 #10 Y:2014 | 10 | 2014 | Use closed cycle process to minimize waste water production | $414,555 | $27,000 | |
| UD0913 #09 Y:2014 | 09 | 2014 | Install automatic stack damper | $2,665 | - | |
| UD0913 #08 Y:2014 | 08 | 2014 | Cover open tanks | $3,270 | $6,780 | |
| UD0913 #07 Y:2014 | 07 | 2014 | Use waste heat from hot flue gases to preheat | $4,485 | $5,000 | |
| UD0913 #06 Y:2014 | 06 | 2014 | Replace boiler | $19,697 | $163,500 | |
| UD0913 #05 Y:2014 | 05 | 2014 | Eliminate cooling of process streams which subsequently must be heated and vice versa | $1,623 | $7,000 | |
| UD0913 #04 Y:2014 | 04 | 2014 | Use adjustable frequency drive or multiple speed motors on existing system | $2,643 | $8,500 | |
| UD0913 #03 Y:2014 | 03 | 2014 | Utilize daylight whenever possible in lieu of artificial light | $511 | $1,275 | |
| UD0913 #02 Y:2014 | 02 | 2014 | Install occupancy sensors | $615 | $570 | |
| UD0913 #01 Y:2014 | 01 | 2014 | Upgrade conveyors | $528 | $255 | |
| NC0529 #09 Y:2014 | 09 | 2014 | Reduce illumination to minimum necessary levels | $38 | $63 |