Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,666

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0133 #02 Y:2014 Preheat boiler makeup water with waste process heat $11,540 $18,000
DL0133 #01 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $63,690 $134,000
BS0044 #10 Y:2014 Install occupancy sensors $2,041 $610
BS0044 #09 Y:2014 Utilize higher efficiency lamps and/or ballasts $5,126 $1,190
BS0044 #08 Y:2014 Utilize higher efficiency lamps and/or ballasts $3,695 $10,868
BS0044 #07 Y:2014 Utilize higher efficiency lamps and/or ballasts $4,856 $10,866
BS0044 #06 Y:2014 Utilize energy-efficient belts and other improved mechanisms $12,633 $872
BS0044 #05 Y:2014 Use optimum thickness insulation $9,004 $6,600
BS0044 #04 Y:2014 Modify refrigeration system to operate at a lower pressure $26,828 $9,000
BS0044 #03 Y:2014 Insulate bare equipment $338 $893
BS0044 #02 Y:2014 Eliminate leaks in water lines and valves $2,822 $2,600
BS0044 #01 Y:2014 Turn off equipment when not in use $170,064 $46,000
BS0043 #10 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,014 $1,242
BS0043 #09 Y:2014 Utilize higher efficiency lamps and/or ballasts $3,381 $7,554
BS0043 #08 Y:2014 Install occupancy sensors $2,340 $981
BS0043 #07 Y:2014 Utilize higher efficiency lamps and/or ballasts $23,042 $52,954
BS0043 #06 Y:2014 Utilize energy-efficient belts and other improved mechanisms $4,075 $429
BS0043 #05 Y:2014 Redesign flow to minimize mass transfer length $13,508 $17,493
BS0043 #04 Y:2014 Utilize controls to operate equipment only when needed $13,411 $5,075
BS0043 #03 Y:2014 Install smaller boiler (increase high fire duty cycle) $111,915 $69,000