Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0477 #10 Y:2012 Utilize energy-efficient belts and other improved mechanisms $6,660 $10,343
NC0477 #09 Y:2012 Develop a repair/replace policy $621 $1,216
NC0477 #08 Y:2012 Install / repair insulation on steam lines $2,106 $4,672
NC0477 #07 Y:2012 Reduce the pressure of compressed air to the minimum required $2,164 $400
NC0477 #06 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $848 $100
NC0477 #05 Y:2012 Install timers on light switches in little used areas $141 $110
NC0477 #04 Y:2012 Install occupancy sensors $17,345 $29,500
NC0477 #03 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,033 $1,068
NC0477 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $3,134 $10,830
NC0477 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $2,444 $4,038
MZ0107 #12 Y:2012 Use photocell controls $265 $320
MZ0107 #11 Y:2012 Repair furnaces and oven doors so that they seal efficiently $845 $1,115
MZ0107 #10 Y:2012 Use optimum thickness insulation $1,288 $1,499
MZ0107 #09 Y:2012 Install compressor air intakes in coolest locations $1,541 $1,810
MZ0107 #08 Y:2012 Reduce the pressure of compressed air to the minimum required $2,356 $710
MZ0107 #07 Y:2012 Repair furnaces and oven doors so that they seal efficiently $2,484 $1,261
MZ0107 #06 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $2,600 $1,745
MZ0107 #05 Y:2012 Install occupancy sensors $4,907 $3,080
MZ0107 #04 Y:2012 Use optimum thickness insulation $6,130 $1,825
MZ0107 #03 Y:2012 Re-size charging openings or add a movable door on equipment $12,972 $3,240