Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0479 #03 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $1,261 $100
NC0479 #02 Y:2012 Use / purchase optimum sized compressor $6,601 $10,000
NC0479 #01 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $9,663 $40,000
OR0601 #08 Y:2012 Replace obsolete burners with more efficient ones $2,164 $8,104
OR0601 #07 Y:2012 Adjust / maintain fork lift trucks for most efficient operation $9,479 $35,500
OR0601 #06 Y:2012 Size electric motors for peak operating efficiency $6,546 $5,306
OR0601 #05 Y:2012 Add equipment/ operators to reduce production bottleneck $51,858 $112,345
OR0601 #04 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,338 $1,616
OR0601 #03 Y:2012 Reduce the pressure of compressed air to the minimum required $1,167 $2,000
OR0601 #02 Y:2012 Improve combustion control capability $10,408 $3,874
OR0601 #01 Y:2012 Change rate schedules or other changes in utility service $4,114 -
WM0022 #03 Y:2012 Insulate bare equipment $2,744 $2,303
WM0022 #02 Y:2012 Install vinyl strip / high speed / air curtain doors $2,779 $6,480
WM0022 #01 Y:2012 Optimize plant power factor $12,280 $30,697
SU0337 #07 Y:2012 Optimize plant power factor $6,664 $33,352
SU0337 #06 Y:2012 Conserve energy by efficient use of vending machines $290 $596
SU0337 #05 Y:2012 Install / repair insulation on steam lines $693 $895
SU0337 #04 Y:2012 Utilize higher efficiency lamps and/or ballasts $469 $346
SU0337 #03 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $4,655 $2,760
SU0337 #02 Y:2012 Install compressor air intakes in coolest locations $1,848 $517