Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0107 #02 Y:2012 Reduce combustion air flow to optimum $43,709 $1,000
MZ0107 #01 Y:2012 Use waste heat from hot flue gases to preheat $76,156 $80,528
LE0354 #04 Y:2012 Insulate bare equipment $459 $42
LE0354 #03 Y:2012 Reduce the pressure of compressed air to the minimum required $1,533 $21
LE0354 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,607 $4,575
LE0354 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $3,024 $8,775
UA0096 #08 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $321 $1,000
UA0096 #07 Y:2012 Reduce the pressure of compressed air to the minimum required $485 $400
UA0096 #06 Y:2012 Lower temperature during the winter season and vice-versa $766 $8
UA0096 #05 Y:2012 Install timers and/or thermostats $3,456 $1,320
UA0096 #04 Y:2012 Install occupancy sensors $1,997 $545
UA0096 #03 Y:2012 Utilize higher efficiency lamps and/or ballasts $12,715 $39,573
UA0096 #02 Y:2012 Utilize energy-efficient belts and other improved mechanisms $817 $996
UA0096 #01 Y:2012 Utilize controls to operate equipment only when needed $13,079 -
UD0875 #06 Y:2012 Insulate bare equipment $4,345 $1,205
UD0875 #05 Y:2012 Replace electrically-operated equipment with fossil fuel equipment $9,804 $5,000
UD0875 #04 Y:2012 Heat treat parts only to required specifications or standards $10,323 -
UD0875 #03 Y:2012 Reduce the pressure of compressed air to the minimum required $4,013 -
UD0875 #02 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $4,208 $1,000
UD0875 #01 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $9,925 $4,300