Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,332

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0668 #02 Y:2010 Turn off equipment during breaks, reduce operating time $7,899 $11,500
MA0668 #01 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $8,378 $1,800
NC0420 #07 Y:2010 Use automatic flow control $377,830 $3,425
NC0420 #06 Y:2010 Use / purchase optimum sized compressor $15,434 $55,000
NC0420 #05 Y:2010 Reduce the pressure of compressed air to the minimum required $23,785 -
NC0420 #04 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $1,604 $100
NC0420 #03 Y:2010 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $67,800 $304,000
NC0420 #02 Y:2010 Utilize higher efficiency lamps and/or ballasts $43,618 $130,787
NC0420 #01 Y:2010 Utilize higher efficiency lamps and/or ballasts $19,026 $62,095
LE0315 #09 Y:2010 Install / repair insulation on steam lines $1,370 $249
LE0315 #08 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $5,370 $2,000
LE0315 #07 Y:2010 Preheat combustion air with waste heat $6,281 $20,000
LE0315 #06 Y:2010 Reduce the pressure of compressed air to the minimum required $7,689 $40
LE0315 #05 Y:2010 Replace existing hvac unit with high efficiency model $18,864 $50,000
LE0315 #04 Y:2010 Install timers and/or thermostats $22,464 $250
LE0315 #03 Y:2010 Reschedule plant operations or reduce load to avoid peaks $25,842 $2,500
LE0315 #02 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $48,359 $25,500
LE0315 #01 Y:2010 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $404,827 $2,200,000
OK0806 #09 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $2,676 $7,130
OK0806 #08 Y:2010 Insulate bare equipment $6,859 $2,964