3,332
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0668 #02 Y:2010 | 02 | 2010 | Turn off equipment during breaks, reduce operating time | $7,899 | $11,500 | |
| MA0668 #01 Y:2010 | 01 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,378 | $1,800 | |
| NC0420 #07 Y:2010 | 07 | 2010 | Use automatic flow control | $377,830 | $3,425 | |
| NC0420 #06 Y:2010 | 06 | 2010 | Use / purchase optimum sized compressor | $15,434 | $55,000 | |
| NC0420 #05 Y:2010 | 05 | 2010 | Reduce the pressure of compressed air to the minimum required | $23,785 | - | |
| NC0420 #04 Y:2010 | 04 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,604 | $100 | |
| NC0420 #03 Y:2010 | 03 | 2010 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $67,800 | $304,000 | |
| NC0420 #02 Y:2010 | 02 | 2010 | Utilize higher efficiency lamps and/or ballasts | $43,618 | $130,787 | |
| NC0420 #01 Y:2010 | 01 | 2010 | Utilize higher efficiency lamps and/or ballasts | $19,026 | $62,095 | |
| LE0315 #09 Y:2010 | 09 | 2010 | Install / repair insulation on steam lines | $1,370 | $249 | |
| LE0315 #08 Y:2010 | 08 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,370 | $2,000 | |
| LE0315 #07 Y:2010 | 07 | 2010 | Preheat combustion air with waste heat | $6,281 | $20,000 | |
| LE0315 #06 Y:2010 | 06 | 2010 | Reduce the pressure of compressed air to the minimum required | $7,689 | $40 | |
| LE0315 #05 Y:2010 | 05 | 2010 | Replace existing hvac unit with high efficiency model | $18,864 | $50,000 | |
| LE0315 #04 Y:2010 | 04 | 2010 | Install timers and/or thermostats | $22,464 | $250 | |
| LE0315 #03 Y:2010 | 03 | 2010 | Reschedule plant operations or reduce load to avoid peaks | $25,842 | $2,500 | |
| LE0315 #02 Y:2010 | 02 | 2010 | Use adjustable frequency drive or multiple speed motors on existing system | $48,359 | $25,500 | |
| LE0315 #01 Y:2010 | 01 | 2010 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $404,827 | $2,200,000 | |
| OK0806 #09 Y:2010 | 09 | 2010 | Use adjustable frequency drive or multiple speed motors on existing system | $2,676 | $7,130 | |
| OK0806 #08 Y:2010 | 08 | 2010 | Insulate bare equipment | $6,859 | $2,964 |